ELECTRONICS ENGINEER(Experienced)
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
BACKGROUND SUMMARY
Over eleven years of extensive computer/electronics experience.Versed in both digital and analog electronics withspecific emphasis on computer hardware/software.Special expertise in system and component evaluation.Network supervisor responsible for installing/maintaining Arcnet LAN system.Proficient in assembly and C programming languages.Excelent communication skills including written,verbal and interpersonal.
PROFESSIONAL WORK EXPERIENCE
Stevenson Data Systems,Los Angeles,CA 1981-1993
Components Evaluation Engineer 1992-1993
Responsible for the characterization and evaluation of, and approved vendors list for:Power supplies,oscillators,crystals,and programmable logic used in desktop and laptop computers.Evaluated and recommended quality components that increased product profitability.Created adn developed power supply test plan used for evqluating third party power supplies.Interacted with vendors to resolve problems associated with components qualification.Technical advisor for Purchasing.Promoted to engineer II.
Design Evaluation Engineer 1990-1992
Evaluated new computer product designs ,solving environmental problems on prototype computers.Conducted systems analysis on new computer profucts to ensure hardware,software and mechanical design integrity.Designed hardware and software for PC,ISA bus programmable load board used for environmental testing.Performed reliability lift testing on computer systems.Installed/maintained 20 user.Novell,Arcnet LAN system.Examined system and sub-system susceptibility to electrostatic discharge in order to meet IEC-801-2 industry standards.Analyzed complete power and load of computer system and subsystem to verify power and load estimations.
Assistant Engineer 1981-1990
Performed extensive hardware evaluation ion prototype computers,tested prototype units for timing violation using the latest state-of-the-art test equipment,digital oscilloscopes and logic analyzers.Performed emvironmental,ESD and acoustic testing.Designed and built a power-up test used to test prototype computers during cold boot.
EDUCATION
Bachelor of Science in Electrical Engineering
--University of Southern California 1990
Associate in Engineering Electronics
--University of Southern California 1981
Job descriptions emphasize candidate's accomploshments.
Work history is stated in reverse chronological order,with most recent employment listed first.
常用英语词语辨析105组(2)
中考英语词汇--“美味水果”大聚会
初中英语短语汇总 A- Y
2009中考英语词汇表 系列I
初中英语常用词组3 量词词组
2009中考英语词汇表 系列PQ
2009中考英语词汇表 系列YXZ
2009中考英语词汇表 系列H
2010年中考英语词汇旧词新义:deal
2009中考英语词汇短语集锦 (2)
09年中考英语总复习经典习题讲解4一数词
十个窍门积累英语词汇
词汇笔记 五种词汇的学习方法 超强
2010年中考英语词汇旧词新义:cost
2009最新中考英语单项填空模拟考试卷 附详解答案
09年中考英语总复习经典习题讲解5一代词
初中英语常用词组2 介词短语词组
初中英语常用词组1 动词词组
中考英语词汇“for短语”全攻略
“爱”成中学生作文出现频率最高词汇
从奥巴马演讲词看英语写作词汇的应用
2009中考英语词汇表 系列N
常用英语词语辨析105组(5)
张惠妹《排山倒海》英文版
09年英语短语集中联想记忆110条
常用英语词语辨析105组(3)
常用英语词语辨析105组(10)
2009中考英语词汇表 系列M
英乐时空Here I Am
常用英语词语辨析105组(11)
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |