In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of
standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
2017届高考英语第一轮复习课时训练15
2016届中考英语第二轮语法复习教案5
2016届中考英语第二轮语法复习教案21
2016届中考英语第二轮语法复习教案7
2017届高考英语第一轮复习检测题8
2017届高考英语第一轮复习课时训练13
2016届中考英语第二轮语法复习教案26
2016届中考英语第二轮语法复习教案9
2017届高考英语第一轮复习课时训练19
2016届中考英语第二轮语法复习教案3
2016届中考英语第二轮语法复习教案19
2017届高考英语第一轮复习课时训练16
2016届中考英语考点跟踪突破复习导学案9
2017届高考英语第一轮复习检测题7
2017届高考英语第一轮复习检测题29
2016届高考英语第一轮复习教案14
2016届中考英语考点跟踪突破复习导学案25
2016届中考英语第二轮语法复习教案22
2017届高考英语第一轮复习检测题9
2016届中考英语考点跟踪突破复习导学案6
2016届中考英语第二轮语法复习教案24
2016届中考英语考点跟踪突破复习导学案5
2017届高考英语第一轮复习课时训练17
2016届中考英语考点跟踪突破复习导学案3
2016届中考英语第二轮语法复习教案8
2016届高考英语第二轮语法复习导学案16
2016届中考英语第二轮语法复习教案23
2016届高考英语第一轮复习教案16
2016届中考英语第二轮语法复习教案18
2016届中考英语第二轮语法复习教案25
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |