In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of
standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
稳重求变难度适中:六级考试阅读理解的点评
大学英语四六级阅读理解备考的支招
六级阅读备考六个大问题
名师总结:六级考生不能不记的阅读的连词
四六级阅读的辅导:全题型 新思维
四六级备考:阅读真题常见的短语(2)
六级阅读理解的特殊解题的技巧
阅读全方位复习方法的指导
六级阅读高分解题的技巧:扫读+跳读
六级阅读冲刺中的常见五类问题的解答
教你快速的在阅读中回原文找信息
提高英语的阅读能力的“第三条道路”
四六级备考:阅读真题常见的短语(5)
英语六级阅读的答案
四六级阅读的技巧:文本再建构
六级考试快速阅读实战的练习
六级阅读高分五个大要诀字斟句酌字字珠玑
四六级备考:阅读真题常见的短语(6)
名师解析四六级阅读常见的三大问题
名师传授四六级阅读能力提高的方法
六级阅读SpeedReading的实战练习五
四六级阅读的技巧:文本再建构
名师分析六级阅读理解发展的趋势
名师四六级阅读技巧的大公开
冲刺战略:用大量的真题来“热身”
四六级阅读题解能力的提高还有“另一条路”
名师指点六级阅读解题要点推荐全题型解题的思路
六级阅读Speed Reading的实战练习(一)
考前冲刺:快速阅读制胜完全的攻略
六级阅读理解考试解题的新思维
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |