In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of
standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
学好英语的39个经典要诀之1到10
名师谈中考英语动词时态正确理解与使用
中考英语常见错误B系列2
中学英语:如何写好英语句子的8种方法
2008年北京中考英语作文分析
中考英语常见错误B系列3
提高英语阅读理解得分有技巧
经典中考英语学习口诀16条
中考英语复习资料:定语从句考点和练习
英语中考:备考全攻略之完型填空篇
中考英语常见错误B系列4
名师指点 现在完成时之二:Since 和 for 的用法
精品推荐:初中成对英语短语汇总
中考英语复习辅导资料之三数词、形容词和副词点击下载
英语中考备考:书面表达常见错误解析
只能用复数的名词总结
名师指导之一:被动语态的时态
中考英语指导:不可缺少的宾语补足语
名师指点 现在完成时 之一:构成
名师指点 现在完成时 之三:固定搭配
名师指导之二:被动语态的特殊形式
英语介词使用口诀 简单易懂
学好英语的39个经典要诀之21到30
中考英语单项选择之解题“六脉神剑”
中考英语指导:不可缺少的宾语补足语
名师指点:多姿多彩的反意疑问句
中学英语指南:09中考必备九类倒装句解析
中考英语连词的用法总结
易使我们误入陷阱的英语单词
备考建议:中考英语作文部分
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |