In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
初三英语被动语态
初三英语上学期 9a Unit 1 vocabulary 牛津英语
综合读写的技巧 新目标英语九年级Unit 1-5 复习
A doctor for animals
SnowWhite白雪公主
JEFC Book 3 Unit 11 Lesson 42
Lesson 26THE MAN WHO NEVER GAVE UP
The Passive Voice
Composition 121
lesson34[上学期]
Lesson26[上学期]
lesson21[上学期]
初三英语上学期chapter8牛津英语
lesson27[上学期]
初三英语全册易错精选题
lesson46[上学期]
lESSON 13[上学期]
初三英语上学期9a Unit 1 grammar牛津英语
lesson 25[上学期]
Unit 4 grammar 名词性从句
初三英语上学期9a Unit 1 intergrated skills牛津英语
lesson24[上学期]
初三英语上学期Book 3 Lesson 31人教版
初三英语上学期9a Unit 1 maintask牛津英语
lesson23[上学期]
Lesson 45 感叹句
初三英语复习2
初三下学期介词复习总结和专练 浙教版
lesson7[上学期]
Book3 Lesson26
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |