In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set ofstandard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months. There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building. After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid. After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work. In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread. 1. The main difference between panel method and the method discussed in the last paragraph is_______. A. the latter uses ready-made internal featuresB. panels are cast in a level position C. the former is used to build walls and floors while the latter to construct bathrooms or bedroomsD. the former is more expensive than the latter22. Which of these statements is TRUE of system building? A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization. 23. According to the passage, the principle of system building is that_______. A. construction methods are safer B. buildings are made from a set of standardized unitsC. similar buildings can be produced D. all units are produced on the site 24. The usual fixed length in the modular system is_______. A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters 25. What lifts the concrete panels onto the building? A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks. 21. A 22. C 23. B 24. D 25. A
北京3月开征“施工扬尘排污费”
环境污染责任险
上海自贸区开卖平行进口车
《立法法》大修明确“税收法定”
“假离婚”夫妇迎来复婚潮
IT大佬两会提议“智慧民生”
官员不作为 总理“怒拍桌”
“中国科幻”走向世界
聚焦“军队反腐”
中国“零售银行”规模将持续激增
中央提出加强“协商民主”
首趟“义新欧”国际班列回家
《政府工作报告》首推图解本
适时启动“深港通”试点
我国鼓励民资参与“养老服务业”发展
深入实施“军民融合”发展战略
“贸易顺差”格局将成常态
春晚“收视率”创新低
政府工作报告中常用的三字表达[1]
有权有钱人更易“减刑”
“人民币跨境支付系统”年底推出
“任性”和“铁帽子王”让翻译纠结
“红包大战”开打
中共国际范宣传视频走红
万众一心开创“四个全面”新局面
中国下调“GDP增长目标”
中国将查处“僵尸政府网站”
中国回应奥巴马批“反恐法”
中国接近“低生育陷阱”应尽快全面放开二孩
京“汽车运输列车服务”启动
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |