In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set ofstandard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months. There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building. After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid. After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work. In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread. 1. The main difference between panel method and the method discussed in the last paragraph is_______. A. the latter uses ready-made internal featuresB. panels are cast in a level position C. the former is used to build walls and floors while the latter to construct bathrooms or bedroomsD. the former is more expensive than the latter22. Which of these statements is TRUE of system building? A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization. 23. According to the passage, the principle of system building is that_______. A. construction methods are safer B. buildings are made from a set of standardized unitsC. similar buildings can be produced D. all units are produced on the site 24. The usual fixed length in the modular system is_______. A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters 25. What lifts the concrete panels onto the building? A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks. 21. A 22. C 23. B 24. D 25. A
英语四级听力猜答案技巧(7)
英语四级听力八大高频场景词汇
2014暑假40天突破英语四级听力第24天
英语四级听力猜答案技巧(1)
40天高分突破英语四级听力阶段三
2014暑假40天突破英语四级听力第2天
40天高分突破英语四级听力阶段五
英语四级听力训练辅音发音
暑期英语四级听力提高五大招
2014暑假40天突破英语四级听力第6天
2014暑假40天突破英语四级听力第3天
2014暑假40天突破英语四级听力第13天
40天高分突破英语四级听力阶段二
英语四级听力猜答案技巧(6)
英语四级听力猜答案技巧(3)
英语四级听力训练连读音
四级听力真题中如何考场景词?
英语四级听力考试分数
40天高分突破英语四级听力阶段一
提高2014英语四级考试听力部分分数
英语四级听力练习选材三误区
英语四级听力重点场景词语集合
2014暑假40天突破英语四级听力第8天
40天高分突破英语四级听力阶段四
英语四级听力备考三大规律
40天高分突破英语四级听力阶段六
2014暑假40天突破英语四级听力第11天
2014暑假40天突破英语四级听力第5天
大学英语四级听力高分指导(7)
英语四级听力猜答案技巧(2)
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |