In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set ofstandard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months. There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building. After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid. After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work. In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread. 1. The main difference between panel method and the method discussed in the last paragraph is_______. A. the latter uses ready-made internal featuresB. panels are cast in a level position C. the former is used to build walls and floors while the latter to construct bathrooms or bedroomsD. the former is more expensive than the latter22. Which of these statements is TRUE of system building? A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization. 23. According to the passage, the principle of system building is that_______. A. construction methods are safer B. buildings are made from a set of standardized unitsC. similar buildings can be produced D. all units are produced on the site 24. The usual fixed length in the modular system is_______. A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters 25. What lifts the concrete panels onto the building? A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks. 21. A 22. C 23. B 24. D 25. A
大学英语四级写作常用词汇精选(3)
精讲最新大学英语四级作文预测及范文(十)
英语四级写作方法与技巧必备常用短语
大学英语四级考试写作精讲常见十二个错误分析
最新大学英语四级作文预测及范文(九)
英语四级作文范文
莫言获得诺贝尔文学奖
最新大学英语四级作文预测及范文(二)
英语四级写作方法与技巧作文定义法
英语四级考试过关写作常用句型
最新大学英语四级作文预测及范文(一)
最新四级阅读考试必备范文广告牌的兴起
运用复杂句型结构和高级词汇得高分
英语四级写作方法与技巧作文加分词汇
关于北京暴雨的英语作文
On the Popularity of Internet
大学生的曲线就之路
英语四级写作方法与技巧作文中间
作文高频基本句式
备战大学英语四级作文常用句型精选12
给朋友道歉函
我们对垃圾的爱之垃圾成堆
写信对朋友进入大学表示祝贺和建议
怎样看待大学里的考证热
双学士学位的现象和我的看法
英语四级写作方法与技巧结尾
引出不同观点的万能句
英语四级作文指点
名师精讲大学英语四级议论文写作课程笔记七
大学生的极生活方式消
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |