In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set ofstandard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months. There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building. After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid. After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work. In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread. 1. The main difference between panel method and the method discussed in the last paragraph is_______. A. the latter uses ready-made internal featuresB. panels are cast in a level position C. the former is used to build walls and floors while the latter to construct bathrooms or bedroomsD. the former is more expensive than the latter22. Which of these statements is TRUE of system building? A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization. 23. According to the passage, the principle of system building is that_______. A. construction methods are safer B. buildings are made from a set of standardized unitsC. similar buildings can be produced D. all units are produced on the site 24. The usual fixed length in the modular system is_______. A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters 25. What lifts the concrete panels onto the building? A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks. 21. A 22. C 23. B 24. D 25. A
SAT作文答题步骤一览
五大SAT实用写作方法
SAT作文主体部分写作方法介绍
SAT写作高分需要的两种能力准备
SAT写作高分范文之popularity
两个SAT满分作文写作技巧介绍
SAT写作经典例子之化学家巴斯德
SAT作文开头写作模板四个
SAT写作词汇应用方法两个
怎样提高SAT写作速度?
SAT写作备考可以从哪几个方面入手?
SAT写作高分八点建议
SAT写作例子之Robert Owen
SAT写作热门例子之Groupon创始人安德鲁·梅森
SAT写作6分范文之discover the truth
SAT写作高分技巧之确定论点和论据
SAT写作满分建议五个
SAT写作高分五大注意事项
6项SAT写作评分标准详细解析
SAT高分作文结构介绍
SAT写作经典例子之法拉第
SAT写作热门例子之Elon Musk
SAT考场写作步骤一览
SAT作文备考误区及应对方法介绍
如何掌握SAT作文考试时间?
SAT写作经典例子之安徒生
SAT写作6分范文之progress and position
阻碍中国考生取得SAT写作高分的用法四个
SAT写作常用句型模板17个
SAT写作高分句式小结
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |