In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set ofstandard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months. There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building. After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid. After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work. In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread. 1. The main difference between panel method and the method discussed in the last paragraph is_______. A. the latter uses ready-made internal featuresB. panels are cast in a level position C. the former is used to build walls and floors while the latter to construct bathrooms or bedroomsD. the former is more expensive than the latter22. Which of these statements is TRUE of system building? A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization. 23. According to the passage, the principle of system building is that_______. A. construction methods are safer B. buildings are made from a set of standardized unitsC. similar buildings can be produced D. all units are produced on the site 24. The usual fixed length in the modular system is_______. A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters 25. What lifts the concrete panels onto the building? A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks. 21. A 22. C 23. B 24. D 25. A
雅思听力快速提高方法解析
雅思听力考试:正态分布原则分析
雅思听力考试必须熟记的一些词汇
雅思听力考试时间的高效利用法
利用VOA慢速英语练习雅思听力的三个步骤
雅思听力常见题型的实用技巧及解题原则
雅思听力动物场景分析与应试策略
分享一些备考雅思听力考试的法宝
雅思听力答题技巧分享
雅思听力考试:替换原则分析
雅思听力:交通工具词汇
雅思听力备考的注意事项
雅思听力难点解析
雅思听力常考词汇整理(二)
提高雅思听力分数 戒掉十大掉分毛病
雅思听力训练手册
雅思听力如何去预测出题点
雅思听力Q&A
雅思听力中的长段子如何做听力练习
如何抓住雅思听力考试宝贵的读题时间?
雅思考试听力备考精听练习技巧
三个雅思听力备考阶段分享
专家教你提高雅思听力水平
实力与技巧的结合 雅思听力的五个学习方法
雅思听力考试:会议场景原则分析
雅思听力考试的基本技巧
雅思听力经典小词100例
雅思听力考试的特点及备考方法
雅思听力解题思路
雅思听力技巧:多选题型
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |