In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set ofstandard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months. There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building. After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid. After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work. In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread. 1. The main difference between panel method and the method discussed in the last paragraph is_______. A. the latter uses ready-made internal featuresB. panels are cast in a level position C. the former is used to build walls and floors while the latter to construct bathrooms or bedroomsD. the former is more expensive than the latter22. Which of these statements is TRUE of system building? A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization. 23. According to the passage, the principle of system building is that_______. A. construction methods are safer B. buildings are made from a set of standardized unitsC. similar buildings can be produced D. all units are produced on the site 24. The usual fixed length in the modular system is_______. A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters 25. What lifts the concrete panels onto the building? A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks. 21. A 22. C 23. B 24. D 25. A
鞭策自己在事业上前进
在不满的现状下成长(一)
成为极品女人的十大要素
应对职位突变的五个方法
找工作哪些方法最有效(一)
职场哪些事不该提及(二)
找工作哪些方法最有效(二)
人力资源专业英语(二)
应聘面试时切忌夸夸其谈(一)
你对成功的定义是什么?
弹性工作制帮企业留住人
为什么雇主会拒绝聘你(2)
职场人际关系的重要性
为什么雇主会拒绝聘你(3)
职场哪些事不该提及(一)
打电话时怎样表达"打扰了"
外企英语面试问题与回答技巧
脑海里没了新创意怎么办?
为什么雇主会拒绝聘你(1)
职场上的十种潜规则
面试谷底时的五根"救命稻草"(二)
应届毕业生求职须知
该如何定义快乐?
职场减压小窍门
上司希望你明白的事情(二)
应聘面试时切忌夸夸其谈(二)
面试前该准备些什么?
面试谷底时的五根"救命稻草"(一)
带病上班坏处多多
中国学历证书的标准翻译
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |