In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of
standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
英语四级词汇笔记(2)
大学英语四级词汇r
大学英语的四级词汇a
四级名词词组及固定搭配
大学英语四级词汇i
40天攻克大学英语四级四级核心词汇及例句(4)
40天攻克大学英语四级四级核心词汇及例句(1)
英语四级单词及英文注释以S开头的单词(一)
英语四级的词汇笔记(5)
英语四级单词及英文注释以R开头的单词
40天攻克大学英语四级四级核心词汇及例句(3)
大学英语四级词汇b
40天攻克大学英语四级四级核心词汇及例句(5)
40天攻克大学英语四级同形异义词辨析Day4
大学英语四级词汇h
大学英语四级词汇d
英语四级词汇笔记(3)
大学英语四级词汇u
英语四级单词及英文注释Organs of the body
40天攻克大学英语四级同形异义词辨析Day7
大学英语四级考试词汇视频第2讲
大学英语四级的词汇训练500题4
40天攻克大学英语四级四级核心词汇及例句(8)
大学英语四级词汇p
40天攻克大学英语四级同形异义词辨析Day1
大学英语四级词汇c
40天攻克大学英语四级同形异义词辨析Day10
英语四级词汇笔记(4)
英语四级单词及英文注释以P开头的单词(一)
四级考试词汇及结构应试对策
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |