In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of
standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
雅思7.5分考生分享高效备考的方法
“四好”方法助提升
非牛人二战雅思6分升7分诀窍
一战雅思8分备考经验和技巧攻略
雅思考试巧记单词之单词拆分法
英国驻华大使馆今年将在甘肃增设雅思考点
考场上心态才是王道
雅思阅读8.5分考生备考经验的分享
雅思阅读8分学员备考心得的分享
雅思阅读8分学员分享各科备考的经验
正确的方法+不断地练习成就雅思7分好成绩
三战雅思终获6.5
雅思阅读8.5分没捷径多看多练才是王道
在校大学生一月备战雅思拿下口语8.5
师傅领进门修行在个人
上班族的快速屠鸭路10个晚上拿下6.5
三周备考拿下雅思8分经验
突击半个月我的雅思也可以拿8分
雅思阅读8分心得学习方法+学习计划
雅思听力单项8.5分考生的心得分享
从复习到考试
雅思提分方法6分升7分的经验分享
烤鸭畅谈在学习心得
雅思牛人分享20天突击备考的方法
雅思听力阅读双8.5考生学习的心得
四个月雅思从6分到7分备考经验之谈
看电影讲故事
如何纠正雅思发音及提高听力的技巧
训练中的20个场景短语
16天备考雅思6.5分经验的总结
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |