In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of
standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
1. A 2. C 3. B 4. D 5. A
职场社交英语:【23--我才不要分心】
职场社交英语:【22--你打算回应他吗?】
职场英语口语:你认为我应该参加篮球队吗
职场英语口语:你是职场“橡皮族”吗?
职场英语口语:你买这车花了多少钱
外企英语:不明了对方所言时
职场英语口语:如何管理邮件
职场英语口语:如何管理时间提高工作效率
职场英语:招聘者的告白
职场英语口语:给我推荐一下喝的茶水
职场英语口语:不要理会他的话
职场英语口语:或许你能给我提些建议
职场社交英语:【3--你是怎么算薪水的?】
职场英语口语:同事之间该如何称呼?
职场英语口语:新车建议用高级汽油
职场英语口语:办公室午餐时间
职场社交英语:【24--我们会熬过去的】
职场百科:大学生求职“自吹自擂”的英文如何表达?
职场英语口语:超级实用的办公室英语
职场英语口语:有关英语学习的建议
职场英语口语:你能给我推荐个牌子吗
职场英语:新官上任开场白
职场英语口语:工作和职业
职场社交英语:【11--你要知道动机何在吗?】
职场社交英语:【4--我会让你发财】
职场英语口语:“给多少钱都不干”怎么说
职场英语口语:每天多做阅读理解试试
职场英语口语:清蒸鱼配上炝炒包心菜
职场英语口语:我会试着照你的话做
职场英语口语:同事之间融洽相处的绝招
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |