In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of
standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
1. A 2. C 3. B 4. D 5. A
大学英语六级阅读训练之三:为什么手机对养育孩子不利?
最新大学英语六级快速阅读精选:飞快的欢乐时光
最新大学英语六级快速阅读精选:女性比男性更容易心碎
名师英语考试板块精讲:英语六级仔细阅读4大题型的方法
英语六级阅读理解练习题(008):慢跑
英语六级阅读理解练习题(004):社会体制
计算机技术为犯罪提供无限机会
英语六级阅读理解练习题(005):蝗虫入侵
英语六级阅读理解练习题(009):购买权
大学英语六级阅读训练之二:裸色
研究空间关系学
最新大学英语六级阅读理解范文强化训练(2)
最新大学英语六级快速阅读精选:热议大学老师低工资
最新大学英语六级快速阅读精选:灰领,黄领,你是什么领?
最新大学英语六级快速阅读精选:灰尘背后的那些事儿
大学英语六级真题阅读:选词填空
最新大学英语六级快速阅读精选:五一小长假安全攻略
英语六级阅读理解练习题(007):金融体制的差异
英语六级阅读理解练习题(003):战争与和平
大学六级英语题型破解系列辅导
最新大学英语六级快速阅读精选:奥巴马大赞林书豪
英语六级阅读理解练习题(002):香港
最新大学英语六级快速阅读精选:我们为什么要阅读?
最新大学英语六级阅读理解范文强化训练(3)
名校名师精讲英语六级考试阅读题讲义(第43篇)
如何帮助更多的人解决失业问题
最新大学英语六级快速阅读精选:雕琢工作(job—crafting)
最新大学英语六级阅读理解范文强化训练(1)
最新大学英语六级快速阅读精选:陪人唠嗑成新兴职业
英语六级阅读部分高频语法1
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |