CAIRO, Feb. 26 -- Egypt is committed to the course of negotiations sponsored by the United States and the World Bank regarding on the Grand Ethiopian Renaissance Dam (GERD) despite Ethiopia's announced non-participation, the Egyptian foreign ministry said on Wednesday.
"Egypt's two ministers of foreign affairs and water resources and irrigation will take part in the ministerial meeting invited by the U.S. administration," said Egypt's Foreign Ministry's spokesman Ahmed Hafez in a statement.
Hafez said that his remarks came in reply to a reporter's question about the recently announced non-participation of the Ethiopian side.
A ministerial meeting between the water and foreign ministers of Egypt, Ethiopia and Sudan is scheduled to be held in Washington on Feb. 27-28 to crystalize a final agreement on the rules of filling and operating the GERD built by Ethiopia on their shared Nile River.
The Ethiopian ministry of water, irrigation and energy said on Wednesday that Ethiopia will not take part in the dam talks in Washington "due to unfinished consultation with national stakeholders," according to state-run Ethiopian News Agency (ENA).
"Ethiopia's negotiation team will not come to the table without coherent consultations as it has not yet completed discussion with domestic experts and stakeholders," ENA quoted the Ethiopian ministry as saying.
The Egyptian foreign ministry said Egypt will still participate in the ministerial meeting "in appreciation of the constructive role played by the U.S. administration over the past few months to help the three countries reach a desired agreement."
Hailemariam Desalegn, the special envoy of Ethiopian Prime Minister Abiy Ahmed, has recently visited Egypt and Sudan and held talks with their leaders over the dam issue but nothing was announced about Ethiopian non-participation.
Upstream Nile Basin country Ethiopia started building its grand hydropower dam in 2011 on the Blue Nile, while Egypt, a downstream country, is concerned that the dam might affect its 55.5-billion-cubic-meter annual share of Nile water.
Egypt's fellow downstream country Sudan eyes future benefits from the GERD construction despite Egyptian concerns.
After years of fruitless ministerial talks between the three countries, fresh rounds of negotiations have been resumed in Washington under U.S. sponsorship and a final agreement was expected to be concluded in late February.
Filling the reservoir, whose total capacity is 74 billion cubic meters, may take several years. Egypt seeks to prolong the period to avoid the negative effects of water shortage, which is a main point of their talks.
The GERD is expected to produce over 6,000 megawatts of electricity and become Africa's largest hydropower dam upon completion.
苏黎世将建“人民币离岸市场”
筷箸习俗申遗
北京用雷达探测“地下违建”
陕西大熊猫感染“犬瘟热”
春运“第三方评价”
春晚“收视率”创新低
微软停止对Windows 7提供“主流支持”
首轮中央巡视瞄准26家央企
我国鼓励民资参与“养老服务业”发展
今年“社会融资”或达18万亿
重庆等地禁“熏腊肉”治霾被拍砖
网民征集春联送习近平
双语盘点习大大带火的那些热词[1]
百度下架违规“涉黄APP”
传统日历遇冷 “定制日历”走俏
羊年春晚“语言类节目”终审结束
明星委员莫成“花瓶委员”
纳税人将有个人“税号”
姚贝娜离世 预防“乳腺癌”成焦点
上海自贸区开卖平行进口车
“贸易顺差”格局将成常态
我们来谈“法”
广电总局拟推“电视剧分级制”
“红包大战”开打
个税改革目标:“综合计征”
“个人征信业务”市场放开在即
中国为“小微企业”减税费
跨区域医疗卫生机构
李克强:打造经济“双引擎”
最高法第一“巡回法庭”深圳挂牌
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |