These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
11月13日雅思阅读真题的解析
雅思历年的真题:听力真题V70(2003新题)
11月22日雅思听力真题的回忆(版)
11月13日雅思听力真题的解析
11月9日雅思听力真题的回忆
马良的写作素材库
雅思历年的真题:听力真题V69(2003新题)
11月13日雅思口语的回忆(网友版)
雅思最近常见的话题的考试准备
11月8日雅思阅读的回忆(网友版)
11月8日雅思写作的回忆(网友版)
11月13日雅思写作的回忆(网友版)
雅思口语的真题:2004年口语新题库
11月8日雅思听力的回忆(网友版)
雅思口语的真题:6月11日雅思口语考试汇总(2)
11月21日雅思考试真题的机经及解析
11月8日雅思口语的回忆(网友版)
11月1日雅思听力真题的解析
11月22日雅思写作真题的回忆(版)
11月8日雅思听力真题的回忆
11月1日雅思口语真题的回忆
11月13日雅思听力的回忆(网友版)
11月21日雅思写作的真题(网友版)
雅思历年的真题:听力真题V86修订版
11月22日雅思口语真题的回忆(版)
11月22日雅思写作真题的解析
11月8日雅思阅读的解析
11月22日雅思口语真题机经的回忆(网友版)
雅思口语第三阶段的问题与答案
雅思历年的真题:听力真题V68(2003新题)
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |