These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
俄罗斯发射高超音速超级核弹头
Soothed feet, clean conscience
Tail wags dog?
中华人民共和国与菲律宾共和国联合声明2
杜特尔特告诉日本他的中国之行只是经济方面
Variety in name not a bad thing
'Jianti' and 'fanti' are equally good
Letting the young learn from life
A reaction to ideological pressure
中英双语话中国民风民俗 第145期:社火是什么
传统的处女情节导致中国处女膜修复手术流行
How a crazy monk led me to enlightenment
抵制中国产品 中国警告对印度投资产生的影响
百日离愁 奥巴马的大失误盘点
抗生素垃圾污染中印河流 大药厂须采取行动
Skin-deep translation may mislead
CNN主播辱华用词分析
Gone south?
莫迪总理和印度士兵一起度过排灯节
什么是“Water cooler”
意大利总理承诺震后重建
Don't turn ritual into a farce
A response to readers' comments
Throw in the towel?
Rub the wrong way?
Make a beeline?
Good manners means avoiding the serious stuff
意大利总理推出重建中部地震灾区计划
Pyrrhic victory 惨胜
How they helped fire young hearts
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |