These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
化妆也显瘦:7个让你看起来很瘦的化妆小窍门
中国房地产开发商进军美国楼市
国内英语资讯:Xi visits cultural heritage site in Gansu
英国NHS体系遭批 被指抛弃老年人
6种积极心态调节法:从今天起改变你的生活!
日本公司推出3D胎儿模型
国内英语资讯:U.S. should immediately cancel Taiwan arms sales plan: spokesperson
中国的网络购物如火如荼,但利润何在
男子不坐飞机走遍201个国家
细数当下小幸福:三个方法重拾对生活的热情
国际素食日:吃素的十大好处
应征入伍:大学生的新出路?
年终职场人必读:绩效考评时脱颖而出的秘密
研究:老板更爱雇佣自己喜欢的员工
中东男子热衷胡须移植
《一九四二》:冯小刚的成与败
英国大学生恶搞自己 头灌牛奶掀起学生新风潮
研究发现:女人更爱偷瞄女人
新版中国护照内页中国地图引越南抗议
婚外情扯出网络隐私安全
蹭课文化风靡校园
有爱短片:1000张照片记录妻子的怀孕历程
离开误交的三类朋友
鸟叔《江南Style》超比伯YouTube登顶
悉尼将斥巨资建中国主题公园 造紫禁城门
纽约警察寒夜为流浪汉送鞋 温暖照片感动网友
“末日”预言逼近 英国人储食备避孕套
英国一中学说谎不受罚 称锻炼交流能力
中国未来的顶级模特从T台转向网络
中国的年轻富豪 并非顶尖学生
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |