These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
现在走路就能赚钱啦!
感恩节晚餐聊什么?
Malarkey: 空话
Peccadillo: 小过失
俄罗斯向税吏发放纸币香味的香皂以激励他们收税
“致癌门”两周后,香肠培根销量暴跌300万英镑
“恨谁给谁买”:火爆圣诞礼物 逼疯孩子家长
以分钟计算的“克强节奏”
“只为享受买打折的快感”,你是这种消费者吗?
伦敦咖啡店禁止顾客穿雪地靴
中国“黑户”人口超1300万
一周热词回顾(11.21-27)
Cockamamie: 荒谬的
研究:会说双语有助中风康复
Gerrymander:重划选区
路易威登新款鳄鱼皮包贵过奔驰车
习近平定调国防和军队改革
By and large: 总体上来说
李克强在第四次中国-中东欧国家领导人会晤上的讲话
科比撰文宣布退役:亲爱的篮球
研究称智能设备让时间变快了
Fair dinkum: 真实的,光明正大的
六句话学会fine line用法
“针织涂鸦”现身魔都
“不耗电屏幕”:手机每周只充一次电
许渊冲:什么才是好的翻译?
奥巴马总统就美国儿童学前教育问题发表演讲
卫计委:5年后每个家庭拥有一名签约“家庭医生”
你不知道的十部感恩节主题电影
首席经济学家:机器人将替代人类50%的工作
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |