The greatest fear of nuclear power opponents has always been a reactor meltdown. Today, the chances of a meltdown that would threaten U. S. public health are very little. But to even further reduce the possibility, engineers are testing new reactors that rely not on human judgment to shut them down but on the laws of nature. Now General Electric is already building two advanced reactors in Japan. But dont expect them even on U. S. shores unless things change in Washington.
The procedure for licensing nuclear power plants is a bad dream. Any time during, or even after, construction, an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court. Meanwhile, the builder must add nice-but-not-necessary improvements, some of which force him to knock down walls and start over. In every case when a plant has been opposed, the Nuclear Regulation Commission has ultimately granted a license to construct or operate. But the victory often costs so much that the utility ends up abandoning the plant anyway.
A case in point is the Shoreham plant on New Yorks Long Island. Shoreham was a virtual twin to the Millstone plant in Connecticut, both ordered in the mid-60s. Millstone, completed for $ 101 million, has been generating electricity for two decades. Shoreham, however, was singled out by antinuclear activists who, by sending in endless protests, drove the cost over $ 5 billion and delayed its use for many years.
Shoreham finally won its operation license. But the plant has never produced a watt power. Governor Mario Cuomo, an opponent of a Shoreham start up, used his power to force New Yorks public-utilities commission to accept the following settlement: the power company could pass the cost of Shoreham along to its consumers only if it agreed not to operate the plant. Ioday, a perfectly good facility, capable of servicing hundreds of thousands of homes, sits rusting.
21.The authors attitude toward the development of nuclear power is______.
A. negative B. neutral
C. positive D. questioning
22.What has made the procedure for licensing nuclear power plants a bad dream?
A. The inefficiency of the Nuclear Regulation Commission. B. The enormous cost of construction and operation.
C. The length of time it takes to make investigations.
D. The objection of the opponents of nuclear power.
23.It can be inferred from Paragraph 2 that______.
A. there are not enough safety measures in the U. S. for running new nuclear power plants
B. it is not technical difficulties that prevent the building of nuclear power plants in the U. S.
C. there are already more nuclear power plants than necessary in the U. S.
D. the American government will not allow Japanese nuclear reactors to be installed in the U. S.
24. Governor Mario Cuomos chief intention in proposing the settlement was to_______.
A. stop the Shoreham plant from going into operation
B. urge the power company to further increase its power supply
C. permit the Shoreham plant to operate under certain conditions
D. help the power company to solve its financial problems
25. The phrase single out is closest in meaning to_______.
A. delay B. end up
C. complete D. separate
21. C 22. D 23. B 24. A 25. D
冲刺必备:四级阅读全攻略
四级阅读理解真题练习
2014年12月英语四级阅读答案(汇总)
英语四级阅读理解评析(版)
专家指导新四级快速阅读解题思路
上海:四级阅读部分点评
四级阅读考生常见问题及解决方法
四级快速阅读参考答案
专家支招四级冲刺 最大程度提高阅读成绩
北京:四级阅读理解答案(A卷)
四级快速阅读真题——网络版
名师指导:大学英语四级考试阅读备考策略
关注细节拿下阅读高分-时态篇
2014年12月英语四级答案:仔细阅读(沪江版)
四级阅读中常见的“信号词”
2014年12月英语四级答案:长篇阅读(沪江版)
超精读分析四级真题阅读一篇
四级考试阅读理解的应试对策
四级快速阅读得分窍门
20个英语四级阅读难点关键句翻译
四级寒假备考:攻克阅读长难句分析技巧
关于四级阅读理解的一点思考
2014年12月英语四级答案:阅读理解二(沪江版)
四级阅读备考三大误区
四级阅读长难句分析及猜单词技巧
四级考试快速阅读常见方法运用
昂立版:四级阅读理解答案(A卷)
四级快速阅读A卷答案
四级阅读理解真题练习
2014年12月英语四级答案:阅读理解一(沪江版)
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |