In the last two hundred years there have been great changes in the method of production of goods. Th
In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
答案:21. A 22. C 23. B 24. D 25. A
英语六级写作句子模板和套句总结3
2011年英语六级考试作文预测2
英语四六级考试写作佳句仿写2
2011年6月英语六级考试写作模板汇总9
大学英语四六级备考写作必背句型2
英语六级作文真题范文与翻译
英语六级的作文真题范文与翻译
2011年英语六级考试作文预测3
英语六级考试写作过关策略三步走套路
英语四六级考试考前必看范文1
大学英语六级考试十篇必背作文9
英语四六级考试写作佳句仿写22
英语四六级考试考前必看范文4
英语四六级写作点睛之笔50句1
大学英语六级考试十篇必背作文6
英语四六级考试考前必看范文7
大学英语六级考试十篇必背作文10
2011年英语六级考试写作练习文章4
英语四六级考试写作佳句仿写11
2011年英语四六级写作句子模板书信2
2013年6月英语六级作文真题范文及翻译
大学英语四六级备考写作必背句型1
大学英语六级考试十篇必背作文7
英语六级写作句子模板和套句总结1
大学英语六级考试十篇必背作文5
英语六级考试作文精彩加分谚语
英语六级考试写作模板汇总7
2011年英语四六级写作句子模板书信4
英语六级考试写作模板汇总6
英语四六级考试考前必看范文2
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |