68
In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer B. buildings are made from a set of standardized units
C. similar buildings can be produced D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks.
参考答案: A C B D A
职称英语2005卫生类B级原题:补全短文
2015职称英语考试真题及答案:卫生类B级完形填空
2007全国职称英语考试题库卫生类B:补全短文
职称英语2005卫生类B级原题:真题及答案解析汇总
2012年职称英语卫生类A级考试真题——概括大意
2012年职称英语卫生类A级考试真题——完形填空
2012年职称英语(卫生类A级)考前预测——完形填空
2012职称英语考试试题:卫生类A级阅读判断
2013年职称英语考试《卫生类A级》考试真题答案解析
2007全国职称英语考试题库卫生类B:词汇选项
2012年职称英语(卫生类A级)考前预测——补全短文
2015职称英语考试真题及答案:卫生类B级参考答案
职称英语真题答案2006年卫生B级:参考答案
2013年职称英语考试《卫生类A级》考试真题
2012年职称英语考试试题及答案-卫生类A
2015职称英语考试真题及答案:卫生类B级阅读理解
2012年职称英语(卫生类A级)考前预测——概括大意
职称英语真题答案2006年卫生B级:真题及答案汇总
2007全国职称英语考试题库卫生类B:阅读判断
2015职称英语考试真题及答案:卫生类B级补全短文
2012职称英语考试试题:卫生类A级概括大意与完成句子
2012职称英语考试试题:卫生类A级阅读理解
2012职称英语考试试题:卫生类A级补全短文
职称英语真题答案2006年卫生B级:补全短文
2012职称英语考试试题:卫生类A级词汇选项
2012职称英语考试试题:卫生类A级真题及答案汇总
2012年职称英语卫生类A级考试真题——词汇选项
2007全国职称英语考试题库卫生类B:参考答案
2012年职称英语卫生类A级考试真题——阅读理解
2012年职称英语(卫生类A级)考前预测——阅读判断
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |