In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer B. buildings are made from a set of standardized units
C. similar buildings can be produced D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks.
参考答案: A C B D A
儿童英语小故事:长颈鹿的小靴子
少儿英语小故事:We are friends
少儿英语小故事:快乐的人
100个儿童英语故事阅读:风和太阳
儿童英语小故事:十块糖
儿童英语小故事带翻译:猜猜我是谁
少儿英语寓言故事:The Wolf and the Lamb
少儿英语故事:Koobor the Koala and Water
儿童英语小故事带翻译:漂亮的洋娃娃
儿童英语小故事:万圣节的英文小故事
100个儿童英语故事阅读:母鸡和小女孩
少儿英语小故事:Little mouse
儿童英语小故事:圣诞树的来源
100个儿童英语故事阅读:愚蠢的小鸡
100个儿童英语故事阅读:你的车怎么了
少儿英语小故事:Hospitals
少儿英语寓言故事:The Lion and the Mouse
儿童英语小故事带翻译:梦想收藏家
100个儿童英语故事阅读:人鱼公主
儿童英语小故事带翻译:在夜晚
少儿英语故事:Rabbit Finds a Home
少儿英语小故事:It’s Good to Admit a Fault
少儿英语故事:A pairy friend
儿童英语小故事带翻译:聪明的熊猫
少儿英语寓言故事:craftsmen
少儿英语小故事:The eagle and the arrow
儿童英语小故事带翻译:调皮的猴子
少儿英语寓言故事:The Bat and the Weasels
儿童英语小故事:咕咚来了
少儿英语寓言故事:The Ass and the Grasshopper
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |