In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer B. buildings are made from a set of standardized units
C. similar buildings can be produced D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks.
参考答案: A C B D A
阿联酋航空明年开通最长直飞航线
人民币汇率趋稳 结束三连跌
七年级英语暑假作业指导
明仁天皇对日本战争行为深刻反省
阿里巴巴和苏宁云商宣布交叉持股
希腊债务可持续性堪忧
2015年七年级英语暑假作业
PS的力量:一张照片演绎各国标准美女外形
环保且时尚:剩菜瓜果摇身一变皮革潮品
2015初二英语暑假作业答案(初中必备)
日本应学德国 “重新取信于邻国”
泰国外交部长竟然向王毅外长表白?
新时代男性新主张 做个家庭妇男挺好
七年级英语暑假作业答案2015
牛仔裤充电宝来袭!充电时尚两不误
北京将会实施单双号限行15天
老妈杀手锏:请乐队当闹铃
iPhone 6S可能为刺激销售放弃"杀手锏"
吃得少活得久 每餐6分饱多活20年
英女王聘请回信助理 年薪2.1万英镑
刺客聂隐娘将于八月底在大陆上映
中国篮球一代传奇巴特尔正式宣布退役
在好莱坞 世界还是白的男的还是直的
国务院办公厅鼓励企业职工周休2.5天
新西兰正在考虑更换新国旗
这些发明改变了世界 你仍不知谁创造了它们
美抗旱奇招:水库投黑色塑料球
埃及禁止小学生戴头巾上学
喵星人专属抓划计算机来袭!
《加勒比海盗5:死无对证》奥兰多强势回归
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |