In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer B. buildings are made from a set of standardized units
C. similar buildings can be produced D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks.
参考答案: A C B D A
北师大版四年级下册数学南方新课堂5.3第3课时等量关系答案
北师大版四年级下册数学南方新课堂6.2第2课时栽蒜苗(一)答案
人教版五年级下册英语南方新课堂Unit5PartA答案
人教版五年级下册英语南方新课堂Unit5PartB答案
北师大版四年级下册数学南方新课堂1.3第3课时小数的意义(三)答
北师大版四年级下册数学南方新课堂5.9第2课时奥运中的数学答案
北师大版四年级下册数学南方新课堂1.6第6课时比身高答案
北师大版四年级下册数学南方新课堂4.4第4课时练习四答案
北师大版四年级下册数学南方新课堂3.2第2课时小数点搬家答案
北师大版四年级下册数学南方新课堂5.2第2课时字母表示数字(二)答案
北师大版四年级下册数学南方新课堂4.3第3课时搭一搭答案
北师大版四年级下册数学南方新课堂1.5第5课时买菜答案
北师大版四年级下册数学南方新课堂3.6第6课时手拉手答案
北师大版四年级下册数学南方新课堂3.5第5课时蚕丝答案
人教版五年级下册英语南方新课堂Unit6PartB答案
人教版五年级下册英语南方新课堂Unit4PartB答案
北师大版四年级下册数学南方新课堂3.4第4课时包装答案
北师大版四年级下册数学南方新课堂5.4第4课时方程(一)答案
人教版五年级下册英语南方新课堂Unit6PartA答案
北师大版四年级下册数学南方新课堂2.4第4课时探索与发现:三角形
北师大版四年级下册数学南方新课堂1.9第9课时练习一(2)答案
北师大版四年级下册数学南方新课堂4.1第1课时看一看答案
北师大版四年级下册数学南方新课堂5.8第1课时密铺答案
北师大版四年级下册数学南方新课堂2.3第3课时探索与发现:三角形
北师大版四年级下册数学南方新课堂5.10第3课时优化答案
人教版五年级下册英语南方新课堂Recycle1答案
北师大版四年级下册数学南方新课堂1.8第8课时练习一(1)答案
北师大版四年级下册数学南方新课堂2.6第6课时练习二答案
北师大版四年级下册数学南方新课堂2.1第1课时图形分类答案
北师大版四年级下册数学南方新课堂2.2第2课时三角形分类答案
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |