standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
2014年职称英语等级考试试卷结构及复习技巧
2013年职称英语等级考试考前30天冲刺复习攻略
2013年职称英语完型填空复习三大注意事项
2013职称英语考试技巧职称英语通关四步答题法
通关秘籍2013年全国职称英语考试实用五招式
2013年职称英语应该如何备考
攻克2013年职称英语三类小题型必备解题技巧
2012年职称英语备考功略选词典快速查词有技巧
2013职称英语考前必看选词典快速查词技巧
2013年职称英语考试技巧单词六大记忆法
2013年职称英语考试新教材复习黄金法则
2014年职称英语考试考前20天冲刺精选答疑
三项准备2013年职称英语完型填空轻松拿高分
2013年职称英语考试备考复习三个必经阶段
2014年职称英语考试各题型基础阶段复习技巧
职称英语考试利用零散时间巧复习
2013年职称英语完成句子答题技巧
2013年职称英语等级考试考前注意事项提醒
2013年职称英语备考技巧超级的学习方法
2014年职称英语考试复习必经的三个阶段
2013年全国职称英语等级考试顺利通关五步走
2013年职称英语考试快速阅读方法和技巧
如何巧背2014年职称英语综合类词汇
职称英语考试单词在阅读句子中如何巧记
2014年职称英语考前30天突破教材技巧两手抓
全国职称英语学习交流英语单词的记忆五法
2013年职称英语完型填空三项准备轻松拿高分
2013年职称英语等级考试完形填空解题技巧
2013年职称英语考试出题思路与答题技巧
2013年职称英语考试强化阶段两大复习重点
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |