standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
张雨绮老公“招妓”被抓
英国发行首支“人民币主权债券”
北京地铁将禁止“乞讨卖艺” 最高罚千元
保险公司推出“宠物保险产品”
人民日报调查揭中国社会心态“十大病症”
故宫首次发行“年票”
科研人员“套取科研经费”被查
广电总局下令封杀“劣迹艺人”
北京地铁“平价时代”终结 将按里程收费
大屏幕现场曝光行人“闯红灯”
“冷冻胚胎”争夺案终审大逆转
西医悬赏5万挑战中医“号脉验孕”
阳澄湖“大闸蟹”开闸
“磁条卡”将逐步停发
十八届四中全会讨论“依法治国”
“自驾游”和“深度游”成黄金周旅游新趋势
公安部“海外追逃”已抓获88名嫌疑人
理发店门口的彩色柱子是用来干啥的?
亚运会卡塔尔女篮“退赛”
快播涉嫌传播“黄毒”被查处
身份证“自拍”系统
广东“登革热”疫情严峻
河北出台APEC期间减排措施
英国商家推出万圣节“埃博拉主题装扮”
10万“吃空晌”人员被清理
研究发现:室内盆栽并不能真正改善空气质量
住房公积金贷款部分“收费项目取消”
“民告官”受案范围拓宽
关于APEC你应该知道的事
天安门“国庆花坛”的变迁[1]
| 不限 | 
| 英语教案 | 
| 英语课件 | 
| 英语试题 | 
| 不限 | 
| 不限 | 
| 上册 | 
| 下册 | 
| 不限 |