In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of
standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
1. A 2. C 3. B 4. D 5. A
感人视频:顽强小宝宝成长的一年
凛冬已至!关于冬季保暖的10件事
担心战时影响发射速度 美国核弹发射密码曾为8个0
骆驼也卖萌!不请自来与主人共进早餐
越努力运气越好:土豪们的励志名言
再不做光棍了!手把手终极约会指南
国际英语资讯:Brazilian govt announces campaign to boost retail sales
美国宇航员登月曾寻嫦娥:带大兔子的可爱姑娘
三只小熊现实版:手拉手跳圆圈舞
第一个感恩节时,人们吃的什么?
国际英语资讯:Sri Lankan PM concludes official visit to Maldives
中国蛋糕大亨造梦幻城堡
控制狂老板?不造反不消极的沟通法
国足运动员郑智荣膺亚洲足球先生
黑色星期五:顾客为抢毛巾大打出手
银行为避嫌禁止交易员使用聊天室
Kid President:我们该常说的20句好话
苏格兰发表独立白皮书 2017年9月公投
英4岁女孩被宠物狗袭击后死亡
西班牙男子忆“狼人”童年生活
想当公务员?骗子更喜欢去政府工作
实用10招 和难相处的人们打交道
为什么大多数中国人对自己的工作无爱
印度学校食物中毒致23名学生死亡 校长夫妇被控谋杀
不离不弃!男子灾后废墟中救爱犬
青少年艾滋病毒感染者十年上升33%
嫦娥三号发射成功 展开奔月之旅
羡慕soho? 如何说服老板让你在家上班
美国一位父亲称在谷歌地图中看到去世的儿子
中国爸爸,你们认为最重要的家务是啥?
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |