In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
参考答案: 1. A 2. C 3. B 4. D 5. A
GMAT数学满分八步走
GMAT数学满分有哪些诀窍
GMAT数学入门需要做到什么
提升GMAT数学成绩有什么技巧
快速突破GMAT数学有什么方法
GMAT数学连续性知识整理
GMAT数学丢分有哪些常见原因
GMAT数学运算词汇有哪些
GMAT阅读入门如何备考
GMAT数学单位转换知识概况
整理GMAT数学中有关统计学的词汇
GMAT数学常见失分点分析
GMAT数学实用做题方法介绍
GMAT数学复习有哪些细节
GMAT数学运算类词汇整理
基础差如何备考GMAT数学
GMAT数学单位转换时需要注意哪些问题
GMAT数学单位转换考点
GMAT数学失分原因:做题不仔细
GMAT数学机经应该怎么用
GMAT数学高分离不开推理能力
GMAT数学几何计量类词汇盘点
GMAT数学排列类问题总结
GMAT数学常用的五大思想
如何有效避免GMAT数学上的逻辑误区
GMAT数学节约时间有哪些技巧
GMAT数学答题有哪些常见的技巧
GMAT数学你一定需要了解的专业词汇
GMAT数学拿高分哪些词一定不能忘
GMAT数学满分需要掌握哪些词
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |