In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
参考答案: 1. A 2. C 3. B 4. D 5. A
2018江苏无锡梁溪七年级下英语期中试题
2018江苏江阴一中七年级下英语期中答案
2018山东菏泽牡丹中学七年级下英语期中试题
2018江苏江阴一中七年级下英语期中试题
2019-2020海南海口七年级上英语期末检测题答案
2018山东临沂经济开发区七年级下英语期中答案
2018江苏江阴二中七年级下英语期中试题
2018浙江金华七年级下英语期中试题
2018浙江绍兴七年级下英语期中答案
2018江苏常州七年级下英语期中答案
2018江苏常州七年级下英语期中试题
2018浙江金华七年级下英语期中答案
2018浙江杭州文澜中学初一下英语期中试题
2018江苏无锡青阳二中七年级下英语期中答案
2019-2020江苏扬中七年级上数学期末试题
2018江苏无锡第一女子中学七年级下英语期中答案
2018广东湛江金城实验学校七年级下英语期中试题
2018浙江杭州十三中七年级下英语期中试题
2018河南驻马店确山七年级下英语期中试题
2018江苏宜兴和桥中学七年级下英语期中答案
2018甘肃靖远五中七年级下英语期中试题
2018江苏宜兴和桥中学七年级下英语期中试题
2018河南郑州桐柏一中七年级下英语期中答案
2018浙江丽水七年级下英语期中答案
2018浙江杭州七年级下英语期中试题
2018江苏江阴二中七年级下英语期中答案
2020届海南省海口市四中高二英语下学期期中试题
2018河北石家庄长安七年级下英语期中试题
2020届莆田第二十四中学高二英语下学期期中试题
2018浙江衢州七年级下英语期中试题
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |