In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
参考答案: 1. A 2. C 3. B 4. D 5. A
北京安检可能减少奥运乐趣
奥运电影经典台词11句
罗格北京奥运会开幕式致辞全文
北京奥运村迎来首批“村民”
双语:《绝望主妇》第七季被爆有新主妇加入
美国人视角:享受奥运,向中国学习
北京奥运 贵宾云集
奥运双语八卦:中国羽坛的夫妻档
奥运金牌:快乐和忧愁天注定?
机器人沉睡45年后重见天日
阿凡达发光树或成真 未来可代替路灯
双语:英国“最大狗”新鲜出炉
郎平率美国女排出征北京奥运
百万张奥运门票发放全国中小学
澳一男子与收养5年爱犬“牵手”婚礼
纳达尔进入奥运状态
周杰伦与“台湾第一美女主播”亲昵..
双语:天桥骄子主持客串绯闻女孩第四季
阿联酋重金奖励夺奥运奖牌运动员
荷兰新推宠物狗啤酒 主人可与狗共饮
网通电信宣布:台湾地震受损电缆恢复运作
牛津字典收录微博词汇 网络用语受宠
美国人喜好调查:最爱披头士最恨慢车
英国全民打赌:谁为准王妃凯特做嫁衣
双语资讯:台湾外海发生6.6级地震
“凡亚比”登陆台湾 将成为今年我国最强台风
奥运给北京树起新地标
走马观花看美国:体验世界过山车之最
双语:中国人均寿命增速有点慢
台湾学生数学成绩全球排名第一
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |