In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
参考答案: 1. A 2. C 3. B 4. D 5. A
实用口语:Nicole's day at school
2011年实用口语练习:学习疑问
2011年实用口语练习:Arrival 入学报到啦
2011年实用口语练习:这只是“权宜之计”
口语情景对话:走遍美国精选 当仁不让 ACT 3 - 1
2011年实用口语练习:今天你“团”了吗
实用口语情景轻松学:说一说旅行要准备的东西
2011年实用口语练习:静观其变
疯狂口语要素精选 7
20条地道实用英语句型(2)
美国生活必备口语:租房英语大全(1)
英语口语主题:交际英语热门话题47个(11--表达歉意)
新东方英语口语开口篇:打招呼(3)
新东方英语口语开口篇:描述外貌(3)
口语情景对话:一个真正的斯图尔特家的后代ACT 1 - 3
实用口语情景轻松学:你最喜欢哪个季节?
口语情景对话:走遍美国精选 没问题ACT 2 - 1
实用英语:如何用英语砍价
口语情景对话:走遍美国精选 二度蜜月ACT 3 - 2
实用口语情景轻松学:老外和菜农砍价时的地道英语对话
那些美剧告诉你的事儿
奥运会实用英语口语200句: 我经常用互联网学英语
节日英语口语:十一句话搞定圣诞礼物
实用口语:选举 Elections
中国常犯的英语口语错误
新东方英语口语开口篇:Age 年龄(4)
疯狂口语要素精选 17
老外“精神不好”时会说些什么
最常用的26句生活用语
口语情景对话:走遍美国精选 偷得浮生半日闲ACT 3 - 1
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |