In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. Which of these statements is TRUE of system building?
A. It employs more men.
B. It is difficult and dangerous.
C. It can save both time and money.
D. It means less mechanization.
2. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. What lifts the concrete panels onto the building?
A. Cranes.
B. Man-power.
C. Pulleys.
D. Hydraulic jacks.
5. The usual fixed length in the modular system is_______.
A. twenty centimeters
B. ten millimeters
C. fifty centimeters
D. ten centimeters
参考答案: 1. C 2.A 3. B 4. A 5. D
学英语方法浅谈-词汇语法篇
雅思阅读是否需要庞大的词汇量
雅思词汇备考:谐音秒杀单词
雅思高分怪招:单词分类综合学习法(4)
雅思听力高频词汇之常用短语30个
短期突破雅思词汇的三大绝招
名师指导:巧记不规则动词
利用日常生活记忆雅思口语词汇
赢战雅思不得不知的12个人文语汇
雅思口语常用名词整理(5)
在语境中记忆雅思词汇
简单中的不简单
雅思听力实用资料:数学词汇解析3
备考资料:雅思高频词汇汇总5
雅思词汇:200个鲜为人知的雅思高频词汇
雅思备考分类词汇:公共标志(3)
名师指导:雅思词汇内功要炼好(一)
24招雅思考试词汇巧记忆
雅思词汇过目不忘六绝招
雅思备考分类词汇:公共标志(5)
怎样才能炼好雅思词汇内功?
雅思备考有关词汇的5个误解
单词:英语字母的音变规律
雅思高分怪招:单词分类综合学习法(3)
雅思高分怪招:单词分类综合学习法(5)
雅思大作文写作范文之control of violence in media
名师浅谈雅思词汇单词拆分法
名师指导:雅思词汇内功要炼好(二)
专家总结雅思词汇有效记忆法
与Food相关的雅思词汇
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |