阅读题型在大学英语六级中占有相当大的比重,阅读的分数却不是那么容易拿全。攻克阅读难题,除了技巧之外,还需要大量的练习,在不断的练习中灵活运用技巧,提升阅读能力。
In the early days of nuclear power, the United States make money on it. But today opponents have so complicated its development that no nuclear plants have been ordered or built here in 12 years.
The greatest fear of nuclear power opponents has always been a reactor meltdown. Today, the chances of a meltdown that would threaten U. S. public health are very little. But to even further reduce the possibility, engineers are testing new reactors that rely not on human judgment to shut them down but on the laws of nature. Now General Electric is already building two advanced reactors in Japan. But dont expect them even on U. S. shores unless things change in Washington.
The procedure for licensing nuclear power plants is a bad dream. Any time during, or even after, construction, an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court. Meanwhile, the builder must add nice-but-not-necessary improvements, some of which force him to knock down walls and start over. In every case when a plant has been opposed, the Nuclear Regulation Commission has ultimately granted a license to construct or operate. But the victory often costs so much that the utility ends up abandoning the plant anyway.
A case in point is the Shoreham plant on New Yorks Long Island. Shoreham was a virtual twin to the Millstone plant in Connecticut, both ordered in the mid-60s. Millstone, completed for $ 101 million, has been generating electricity for two decades. Shoreham, however, was singled out by antinuclear activists who, by sending in endless protests, drove the cost over $ 5 billion and delayed its use for many years.
Shoreham finally won its operation license. But the plant has never produced a watt power. Governor Mario Cuomo, an opponent of a Shoreham start up, used his power to force New Yorks public-utilities commission to accept the following settlement: the power company could pass the cost of Shoreham along to its consumers only if it agreed not to operate the plant. Ioday, a perfectly good facility, capable of servicing hundreds of thousands of homes, sits rusting.
21.The authors attitude toward the development of nuclear power is______.
A. negative B. neutral
C. positive D. questioning
22.What has made the procedure for licensing nuclear power plants a bad dream?
A. The inefficiency of the Nuclear Regulation Commission. B. The enormous cost of construction and operation.
C. The length of time it takes to make investigations.
D. The objection of the opponents of nuclear power.
23.It can be inferred from Paragraph 2 that______.
A. there are not enough safety measures in the U. S. for running new nuclear power plants
B. it is not technical difficulties that prevent the building of nuclear power plants in the U. S.
C. there are already more nuclear power plants than necessary in the U. S.
D. the American government will not allow Japanese nuclear reactors to be installed in the U. S.
24. Governor Mario Cuomos chief intention in proposing the settlement was to_______.
A. stop the Shoreham plant from going into operation
B. urge the power company to further increase its power supply
C. permit the Shoreham plant to operate under certain conditions
D. help the power company to solve its financial problems
25. The phrase single out is closest in meaning to_______.
A. delay
B. end up
C. complete
D. separate
参考答案:21. C 22. D 23. B 24. A 25. D
GMAT经典范文赏析:我们的理想和现实
备考的牛人GMAT写作复习策略分享
GMAT写作备考中的实践经验分享
GMAT写作不可不知的复习小技巧
GMAT写作模板分享
GMAT写作精品模板:时序性因果攻击
增加GMAT写作色彩的必备短句整理
二战760分考生谈GMAT写作的备考方法
GMAT写作4-6分的评分标准
提高GMAT写作速度的方法指导
快速提高GMAT写作水平的方法
十二句GMAT写作黄金句整理
浅谈论据在GMAT作文中的重要作用
GMAT写作备考如何累积过渡和修辞词汇?
GMAT写作满分开头段是关键
GMAT写作必备句型总结
GMAT写作精品模板
快速提升GMAT写作水平的方法
GMAT写作复习的10个要点
提高GMAT作文水平需要从因果证三方面入手
GMAT写作模板的使用经验分享
GMAT写作常用词汇
盘点GMAT写作常用的几种写作结构
如何应对GMAT写作E-Rater的评分?
备考GMAT写作必知的5件事
拿下GMAT写作满分的备考方法
GMAT写作用什么写作格式最佳?
GMAT作文层层递进的写作方法
GMAT写作的15条常用规律
GMAT写作满分要掌握的钻石句型
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |