Three weeks ago the government scrapped plans to build the countrys first carbon capture and storage facility at Longannet power station in Fife in Scotland. That was a blow in the fight against climate change: if carbon dioxide can be stripped out of power plant emissions and other factories and stored safely underground, fossil fuels could be used without such damage to the planet. The government has promised to pay 1 billion for a pilot project. Since the Longannet work was going to cost more to build than that, it was abandoned.
Even as that project was being ditched, government officials were quietly murmuring about a proposal for CCS at a gas-fired power station at Petershead, Aberdeenshire. Sure enough, a few weeks on another piece of good news has dribbled out: SSE, which runs the Petershead plant, has teamed up with Shell on the project it is proposing. SSE had already applied for European funding for CCS at Petershead. But the tie-up with the oil and gas major is new.
Its certainly a good idea. This should give SSE extra cash to help fund a detailed engineering design. As importantly, it means that, if the project goes ahead, the gas will be transported to the Shell-operated Goldeneye gas field in the North Sea. The idea is to use existing infrastructure as far as possible.
Shell is clearly keen to get involved in CCS it was also a partner of Scottish Power in the Longannet project . That makes sense. If this technology can be made to work, there could be a fabulous commercial business for Britain and for the companies involved. The International Energy Agency estimates that 850 projects will be needed globally by 2030. And since many countries in Europe do not have easy or obvious places to store their CO2 emissions, there may be an opportunity for companies like Shell to make a lot of money importing other peoples waste.
Theres an added reason why CCS may be a good business bet. Theres a suggestion that pumping CO2 into a former oil field could help force out some of the remaining reserves which are ordinarily hard to get at, a process known as enhanced oil recovery. That makes CCS more cost-effective, because one of the by-products has a high value and should mean a plant needs less financial support. It also makes it a particularly appealing prospect for a company such as Shell that has been extracting oil and gas from the North Sea for decades and has already used up many of the easiest fields.
But its far too early for any talk of a bonanza for SSE and Shell, or for Britain. The two companies are clearly waiting for ministers to throw them some money before they do anything at all. The government gave around 30m towards the Longannet project plan. They also hope to receive money from Europe for the pilot. Even if the money comes through, the firms wont be in a position to begin a full engineering design until the second half of next year. So this weeks news is good but Britains first carbon capture and storage plant remains a very long way off.
雅思词汇:词根背单词“-voc-”
雅思词汇:英语单词记忆法之对比法
雅思考试分类词汇:有关报纸的用语
雅思词汇记忆其实也不难:对比法
雅思阅读真题词汇:古苏格兰乌鸦造工具
两种雅思词汇记忆方法介绍
雅思常用分类词汇:春节
雅思常用分类词汇:船舶-1
雅思词汇:词根背单词“-viv-/-vit-/-vig-”
雅思词汇:英语单词记忆法之拆字法
雅思考试分类词汇:有关会议的词汇
雅思考试词汇:宇宙
雅思词汇记忆其实也不难:新构词法
雅思词汇:词根背单词“cap, capt, cept ,ceive, cip, cup”
100个句子记完7000雅思词汇
词根法巧记雅思词汇:“corp-/corpor-”
雅思词汇:专家总结背诵雅思单词的方法
雅思考试分类词汇:有关钱币的词汇
雅思词汇记忆其实也不难:拆字法
雅思词汇:记单词的20种方法
雅思词汇:词根背单词“-vac-/-van-/-uoid-”
雅思听力场景高频词:银行场景
雅思词汇:英语单词记忆法之音像法
雅思词汇记忆其实也不难:音像法
词根法巧记雅思词汇:“Multi-”
雅思考试分类词汇:有关公司员工职务词汇
雅思词汇:英语单词记忆法之谐音法
词根法巧记雅思词汇:“-pos-/-posit-”
雅思考试分类词汇:有关外贸相关词汇
35个雅思听力高频词汇
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |