BANGKOK, Dec. 24 -- The China-Thailand high-speed railway will upgrade Thailand's transport system and unleash economic potentials of region along the route, said a Thai expert.
Thailand will enjoy more economic benefits once the high-speed railway connects the country's capital Bangkok with China and other countries, which will help attract more foreign tourists and narrow regional economic disparity of Thailand, Huang Bin, China Research Institute director of Kasikorn Research Center in Thailand told Xinhua.
The construction of the first section of the railway line officially began on Thursday with a ground-breaking ceremony in the northeastern Thai province of Nakhon Ratchasima.
The 253-km first phase of the railway links Bangkok with Nakhon Ratchasima province. China is responsible for design of the railway, supervision of construction and manufacturing of trains and signal systems, among others.
Once completed, the railway with a maximum speed of 250 km per hour will be the first high-speed railway of Thailand.
The second phase of the project will link Nakhon Ratchasima with Nong Khai on the border with Laos, which connects with the China-Laos railway in an artery railway linking Thailand, Laos and China.
Huang, an expert who has been paying close attention to the project, looks forward to the operation of the railway. He envisions the boom of Thailand's economy in its northeastern part under the project.
Northeastern Thailand, a region with one-third of Thailand's land area that contains about one-third of the country's population, contributes only one 10th of the Kingdom's GDP, said Huang, adding that the poor transportation results in its sluggish development.
According to Huang, there are about 4,507 km of meter gauge lines in Thailand, of which 90 percent is still single track. There are also problems with old equipment, poor management and maintenance, and low speed.
As a result, the annual volume of railway freight is less than a 10th of the total transport volume. It is estimated that the cost of land transport is six times that of rail. Since rail does not offer an alternative, the logistics costs in Thailand are higher than those in other countries.
The China-Thailand high-speed railway project will help upgrade Thailand's railway system. It is foreseeable that the railway will bring wide-reaching connectivity in the country while reducing logistic costs, and thus make Thailand ASEAN's (Association of Southeast Asian Nations) trade and investment center, as well as a transport and logistics hub.
The China-Thailand railway will be finally connected with the China-Lao railway, thus using Chinese technology, which has been widely recognized across the world, will make it more accessible in the connectivity plan, said the expert.
The project is a genuine joint contribution of the two countries, which is also an achievement in bilateral cooperation under the Belt and Road Initiative, said Huang.
The project is part of China's Belt and Road infrastructure drive, which aims to build a modern-day "Silk Road" connecting China with economies in Southeast and Central Asia, Middle East and Europe by land and by sea.
人教新起点英语一下《Unit 9 Classroom》(Lesson 49-51)ppt课件
人教版新起点英语一下《Unit 1》PPT课件4
人教版新起点英语一下《Unit 1》PPT课件2
人教新起点英语一下《Unit 15 Food and drink》(Lesson 85-87)ppt课件
人教版新起点英语一下《Unit 6 Toys》PPT课件2
人教版新起点英语一下《Unit 15 Food and drink》PPT课件2
2017春人教版(新起点)英语一下Unit 3《Toys》(Lesson 2)ppt课件
人教新起点英语一下《Unit 11 Toys》(Lesson 61-63)ppt课件
人教新起点英语一下《Unit 14 Clothes》(Lesson 79-81)ppt课件
2017春人教版(新起点)英语一下Unit 2《Room》教学素材包
2017春人教版(新起点)英语一下Unit 1《Classroom》(Lesson 2)ppt课件
2017春人教版(新起点)英语二下Unit 3《Seasons》(Lesson 2)课件
人教新起点英语一下《Unit 13 Shapes》ppt课件
人教新起点英语一下《Unit 12 Review》(Lesson 70-72)ppt课件
人教版新起点英语一下《Unit 13》PPT课件
2017春人教版(新起点)英语二下Unit 3《Seasons》(Lesson 1)课件
人教新起点英语一下《Unit 14 Clothes》ppt课件
人教新起点英语一下《Unit 9 Classroom》(Lesson 52-54)ppt课件
人教版新起点英语一下《Unit 15 Lesson13》PPT课件
人教版新起点英语一下《Unit 9 lesson 4》PPT课件
2017春人教版(新起点)英语一下Unit 3《Toys》教学素材包
人教新起点英语一下《Unit 16 Review》(Lesson 91-93)ppt课件
人教新起点英语一下《Unit 13 Shapes》(Lesson 76-78)ppt课件
人教版新起点英语一下《Unit 14 Clothes》》PPT课件
人教版新起点英语一下《A warm welcome to the parents’ meeting》PPT课件
2017春人教版(新起点)英语一下Unit 2《Room》(Lesson 1)ppt课件
人教版新起点英语一下《M3U1where’s the orange cat》PPT课件1
人教版新起点英语一下《M5U2》PPT课件
人教版新起点英语一下《Unit 16 Review》PPT课件
人教版新起点英语一下《Unit 1》PPT课件3
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |