BEIJING, Dec. 31 -- Beijing authorities have launched two new railway lines.
One of the new lines, linking the city proper with Tongzhou District, became operational on Sunday morning. The 38.8-km-long line connects Shijingshan District in the west with Tongzhou in the east. Five stations have been set up, though only four are currently operational. With the new line, passengers only need 28 minutes to get from Beijing Railway Station to Tongzhou.
The line is expected to help ease transport pressure between the city center and Tongzhou.
Another line links Changping District with the suburb districts of Huairou and Miyun. It spans 135.6 km and has six stations. Currently only three stations are in operation.
GRE词汇含义如何准确掌握
巧用谐音记忆GRE词汇
GRE法律类词汇整理
什么方法记忆GRE词汇最有效
GRE考试词汇量要求简介
GRE词汇:税务类词汇盘点
如何搞定GRE单词学习方法
GRE词汇备考前需要考虑哪些问题
如何利用蓝宝书解决GRE词汇难题
GRE词汇背诵有哪两个阶段
GRE词汇文化背景简介
GRE词汇背诵的两大阶段
GRE词汇记忆效率如何提升
如何利用SAT词汇引申记忆GRE词汇
GRE词汇如何学以致用
GRE红宝书词汇怎样记忆最高效
盘点与色彩有关的GRE词汇
21天掌握GRE核心高频词汇:第六天
盘点与睡眠有关的GRE词汇
快速翻书法记忆GRE词汇
教你如何避开GRE词汇误区
GRE词汇考察方向
分析新GRE词汇量减少是好还是坏
盘点形容女子的GRE词汇
GRE词汇记忆流程概况
GRE词汇搭配学习法介绍
通过做真题备考GRE词汇
关于贬值的GRE词汇精选
21天掌握GRE核心高频词汇:第一天
学俚语记忆有关circles的GRE词汇
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |