Download
A yearlong assessment of the controversial Shuangjiangkou hydropower project in southwestern China has been given approval on Monday, prompting concern among green campaigners and local residents.
Despite critics claiming the dam - on the upper reaches of Dadu River in Sichuan province - would affect water quality, kill fish and result in several nature reserves being submerged, the Ministry of Environmental Protection gave the assessment the green light.
China Guodian Corp has invested 24.68 billion yuan ($4 billion) in the hydropower project, which started construction in 2008. The project is expected to generate an installed capacity of 2,000 megawatts.
Its reservoir will hold 3,135 billion cubic meters of water and have a catchment area of 39,330 square kilometers.
According to the assessment report, the plans are in accordance with China's energy development plan.
However, Liu Shukun, a professor at China Water Resources and Hydropower Institute, said cascading dam projects such as this do influence the ecological system.
"The chemical, thermal and physical changes that flowing water undergo, when it is stilled, can seriously contaminate a reservoir or river downstream," he said.
"That causes blue-green algae, the death of fish, and an increase in turbidity.
"A negative influence of aquatic ecology and sediment accumulation would occur as the water quality deteriorates."
Liu suggested that it is better to preserve at least 50 percent of the river course, instead of creating a cascade development, which sees a flowing river fed into one reservoir after another.
This was recognized in a notice by the Ministry of Environmental Protection in September, he added, as there have already been seven cascades built on Dadu River. Shuangjiangkou is on the fifth.
In addition to influencing the river, the project will also affect, or completely submerge, six national-level nature reserves and the Dadu River Valley National Geopark, said Chen Gang, a senior engineer for Guodian, in an article published in Hydro power magazine.
Meanwhile, a government official in Sichuan's Hanyuan county, who asked not to be identified, said the Dadu River would be unrecognizable from the waterway he remembers from his youth.
"The naturally turbulent flow of the river will be gone forever," he said.
"Although I know hydropower development is important for the government’s energy strategy, it is still such a shame when mountains and rivers disappear.
"My son will never witness that natural beauty," he said, remarking that the banks of the river - the largest tributary of the Yangtze River - are now largely construction sites.
To help the project pass the assessment, Guodian pledged several measures to prevent or reduce any negative impact.
A 60-km unexploited river course from Jinba to Danba would be preserved for fish habitat, for instance, according to information in the report disclosed on the ministry's website.
It also said no wasteland or construction sites would be created in the nature reserves, while a rare botanical garden as well as a forestry research institute would be created to help preserve local forestry.
After being approved, the assessment has been released for a five-day public consultation period.
Objections or suggestions regarding any negative environmental impact can be raised within the period.
"Any project that poses such huge potential risk should only be completed with public approval," said Yang Yong, a geologist with Hengduan Mountain Research Society, an independent research institution.
"It's important to let the public know how construction decisions are made. A full discussion as well as thorough scientific research is needed."
Questions:
1. Where will the new dam be located?
2. How many cascades have been built along the Dadu River?
3. Yang Yong is a geologist with which group?
Answers:
1. On the upper reaches of the Dadu River.
2. 7.
3. Hengduan Mountain Research Society.
About the broadcaster:
Lance Crayon is a videographer and editor with China Daily. Since living in Beijing he has worked for China Radio International (CRI) and Global Times. Before moving to China he worked in the film industry in Los Angeles as a talent agent and producer. He has a B.A. in English from the University of Texas at Arlington.
职场英语:2013工作不再有遗憾 如何及时补救职业遗憾
2012年我们犯下的12个错误,明年一定不犯了(双语)
日常办公室用语-日常用语:外企白领英语口语Unit 03(1)
职场英语学习:请假参加朋友的婚礼
职场英语学习:常用的办公用品已经给你准备好了
职场英语学习:白领族必备的50句英语潮句
职场英语学习:职业女性的健身计划
职场英语学习:辞职的原因(1)
职场英语学习:利润成本分析
业务往来-合同恰谈常用口语:外企白领英语口语Unit 06(3)
职场英语学习:招聘新员工
有职场英语学习:关加班的实用职场口语
职场英语学习:客户调查问卷
职场英语学习:产品营销
部门职能 -总经理办公室常用口语:外企白领英语口语Unit 05(1)
职场英语学习:设备采购
走进外企-走进外企的常用语:外企白领英语口语Unit 02(2)
部门职能 -产品包装部常用口语:外企白领英语口语Unit 05(4)
日常办公室用语-网络的常用口语:外企白领英语口语Unit 03(5)
职场英语学习:如何用英语聊压力(3)
休闲娱乐-体育运动常用口语:外企白领英语口语Unit 08(2)
会议用语-工作总结会常用口语:外企白领英语口语Unit 04(6)
职场英语:高职务的强势女性更苗条(双语)
休闲娱乐-度假计划常用口语:外企白领英语口语Unit 08(4)
职场英语:成功人士说 活到老学到老才是王道
职场英语学习:这是咨询部的工作人员
会议用语-主持会议常用口语:外企白领英语口语Unit 04(2)
职场英语学习:质量管理
职场英语学习:团队合作
职场英语学习:客户服务
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |