In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer B. buildings are made from a set of standardized units
C. similar buildings can be produced D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks.
参考答案: A C B D A
中国雅思考生全球第一提前报名很有必要
名师总结雅思阅战报
考分水涨船高 三类雅思考生寒假需进补
雅思考生低龄化趋势中学生应该怎样面对
贴心提醒详解雅思考试报名流程各步骤
中国雅思考生激增近六成 两类考生成绩提升快
雅思提分技巧坚持浏览英语资讯网站
专家点拨考雅思需要读透的几本书
雅思写作考试加分词汇同义词转换
2月16日深圳雅思考生口试改在18日进行
高中生遭遇雅思我的8分考试经验谈
谨遵稳准狠雅思考试备考新手指南
名师点拨2月雅思考试写作话题预测
名师点津攻克鼠年雅思的两大新思路
雅思写作范文计算机是否使书写技能消退
1月19日雅思考试真题写作思路剖析
考生必读雅思考试逻辑关系词的阅读功能
国外多所高校拔高硕士入学雅思门槛
雅思考试共考4次报考持续火爆
今年沪上啥最热雅思火爆开考一瞥
考场经验分享我的雅思考场回忆
正视雅思考试一些远比技巧重要的话题
简单即美雅思口语考前一个月突破宝典
大一新生雅思考试由5点5上升至7分经验谈
雅思阅读高手指南态度与习惯决定一切
多方利好催热雅思考试 考生出现低龄化趋势
烤鸭必读雅思写作高分9条制胜法宝
雅思口试将从22日开始进行
经验分享上班族首次考雅思喜获7分
考生超21万考雅思的人会越来越多
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |