68
In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer B. buildings are made from a set of standardized units
C. similar buildings can be produced D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks.
参考答案: A C B D A
如何应对雅思口语抽象话题?
攻克雅思口语考官的五大诀窍
雅思口语范文:a wild animal
雅思口语高分句式:定语从句
三篇雅思口语经典范文:unemployment
雅思口语考试如何避免冷场
28个雅思口语经典问题
雅思口语范文:an artist
雅思口语万能模板参考
雅思口语三部分的答题技巧
雅思口语“综合症”的原因和应对方法
雅思口语需掌握一定的词汇量
雅思口语范文:Lifestyle
雅思口语素材:《生而为赢》经典台词
雅思口语话题表达:论语名言
雅思口语考官常问的问题分析
雅思口语part2最难十题难点解析
雅思口语素材:好句推荐-人生的悲剧
雅思口语范文:Family Event
揭秘雅思考官的思维模式及答题思路
如何处理雅思口语考试四大麻烦?
雅思口语天天练:各种恋爱关系
两个雅思口语高分技巧
详解雅思口语考试流程
雅思口语备考勿踏“背诵”泥潭
雅思口语范文:人物卡片
雅思口语高分必须遵守的五大潜规则
雅思写作常用词汇-环境
雅思口语备考辅导:一误区一建议
雅思口语高分范文:Describe a Family
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |