In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
参考答案: 1. A 2. C 3. B 4. D 5. A
2014英语四级听力练习慢速(9)
英语四级听力必备十大标志词
英语四级听力场景全解析(4)
英语四级听力入门阶段的训练方法和技巧
2014英语四级听力四大备考建议
英语四级听力怎么练?
英语四级听力题型解析转折题
英语四级听力长对话听前预测技巧
英语四级听力做题五原则
英语四级听力场景全解析(5)
版四级听力重点场景词语集合
新四级听力一个月复习规划
英语四级听力场景词汇机场场景
英语四级听力场景全解析(7)
英语四级听力场景全解析(2)
英语四级听力常考习语
英语四级听力备考方法
英语四级听力场景全解析(8)
英语四级听力考前最后冲刺指南
英语四级听力题型解析事实状况题
2014英语四级听力场景词汇购物场景相关词汇
学生英语四级听力差的原因及提高建议
2014英语四级听力练习慢速(4)
英语四级听力复习指导
核心四级听写词汇与短语列表
英语四级听力题型解析引申题
英语四级听力考试常见词汇
英语四级听力场景全解析(9)
2014英语四级听力练习慢速(1)
英语四级听力提分技巧
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |