In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
参考答案: 1. A 2. C 3. B 4. D 5. A
2016高考英语二轮复习提高阅读能力要加强课外阅读
总结2016高考英语突破完形填空的要领
盘点高考二轮复习2月和3月英语复习内容
2015-2016高考英语二轮复习常见的七大误区
备战2016年高考英语第一轮复习的七大方法
专家建议高考英语二轮复习一点要培养语感
李俊和谈2016高考英语要提高阅读量
英语2016高考二轮复习听力练习的三个阶段
总结高考二轮复习提高英语背诵效率的办法
2015-2016高考英语一轮复习的四点建议
2016高三下学期英语复习要千锤百炼熟能生巧
2016中考英语得分技巧(秘决)
高考复习拿下英语听力的五个步骤
盘点最新2016高考二轮复习英语阅读理解的八种能力
(2016)中考英语复习三大技巧
2016高三英语二轮复习需掌握的五个原则
2016年高考英语复习要做好的六件事
五大2015-2016高考英语第一轮复习的技巧
老师盘点2016高考英语复习单词速记法
2016年中考英语听力测试应答技巧
2016年高考英语一轮复习要练习适当有效训练
学霸分享2016年高考英语完型填空实战方案
2016最新英语第一轮复习的方针和策略
中考英语复习技巧(听力篇)
2016年高考英语二轮复习指导:快速阅读四大法则
考生高考第一轮英语复习要做好6件事
考生必读:2016中考英语复习建议
中考英语满分作文写作指导(2016)
高考英语二轮复习如何提高高考英语听说能力
高考英语二轮复习策略2016
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |