In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
参考答案: 1. A 2. C 3. B 4. D 5. A
GMAT考试必备的两个模板
GMAT作文机经 游乐园换slogan
GMAT写作速度速升法
GMAT综合推理部分的重要性
GMAT写作经典开头总结
GMAT考试写作易错句型集合
GMAT写作之经典范文
GMAT作文黄金题
GMAT作文机经 开pizza和golf club
GMAT优秀作文精选(三)
GMAT写作常用的15条公理
GMAT写作模板句型
怎样写好GMAT考试作文的开头
备战2015GMAT写作:考场上如何预估作文字数
GMAT IR逐个击破
GMAT写作有没有字数要求
GMAT计分方法介绍
2015GMAT写作常见问题解读
无需为综合推理部分感到担心
揭秘GMAT 综合推理
GMAT:Integrated Reasoning (IR)解析
GMAT考试增加“综合推理”部分
GMAT作文机经
对GMAT考试写作满分的提示
GMAT考试详细介绍
GMAT作文机经 建bio公司
2013年GMAT综合推理部分常见问题
GMAT作文模板使用的七大忌
GMAT写作速度的控制
浅析GMAT非形式逻辑解题
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |