In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. The usual fixed length in the modular system is
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
参考答案: 1. A 2. C 3. B 4. D 5. A
专家支招:学英语要善用情境模式
英语教育专家“把脉”少儿英语
怎样为孩子制定读书计划
剑桥少儿英语的最佳学习时间安排
英语口译学习的八荣八耻
07年9月北京市剑桥少儿英语全国统一考试7月5日开始报名
少儿英语学习方法介绍
口译笔译技巧篇:了解各国的文化
口译达人必背:中国成语巧英译
用英语写故事的7岁女孩 出众的水平并不只是天赋
专家给父母七条建议:请允许孩子“虚度光阴”
剑桥少儿英语学生守则
“聪”明方法学好英语:家长要给孩子当“粉丝”
家长必读:如何在课后辅导孩子学好启蒙英语?
2012年雅思阅读模拟试题
剑桥少儿英语改版 词汇与考试模式均有变化
少儿学英语有助全面发展
2012年雅思语法模拟练习题
2008年雅思阅读模拟试题
2011年雅思阅读模拟试题
口译绝招:口译中数字的翻译
雅思阅读模拟题:satisfactory education
2009年雅思阅读模拟试题
专家给父母七条建议:请允许孩子“虚度光阴”
口译技巧:解密口译5大翻译绝招
家庭英语环境“巧”营造
三岁孩子学了半月英语却变结巴?
也谈早期外语教育
父母辅导孩子学习英语的技巧
英语口译翻译原则:要词原则
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |