In the early days of nuclear power, the United States make money on it. But today opponents have so complicated its development that no nuclear plants have been ordered or built here in 12 years.
The greatest fear of nuclear power opponents has always been a reactor meltdown. Today, the chances of a meltdown that would threaten U. S. public health are very little. But to even further reduce the possibility, engineers are testing new reactors that rely not on human judgment to shut them down but on the laws of nature. Now General Electric is already building two advanced reactors in Japan. But dont expect them even on U. S. shores unless things change in Washington.
The procedure for licensing nuclear power plants is a bad dream. Any time during, or even after, construction, an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court. Meanwhile, the builder must add nice-but-not-necessary improvements, some of which force him to knock down walls and start over. In every case when a plant has been opposed, the Nuclear Regulation Commission has ultimately granted a license to construct or operate. But the victory often costs so much that the utility ends up abandoning the plant anyway.
A case in point is the Shoreham plant on New Yorks Long Island. Shoreham was a virtual twin to the Millstone plant in Connecticut, both ordered in the mid-60s. Millstone, completed for $ 101 million, has been generating electricity for two decades. Shoreham, however, was singled out by antinuclear activists who, by sending in endless protests, drove the cost over $ 5 billion and delayed its use for many years.
Shoreham finally won its operation license. But the plant has never produced a watt power. Governor Mario Cuomo, an opponent of a Shoreham start up, used his power to force New Yorks public-utilities commission to accept the following settlement: the power company could pass the cost of Shoreham along to its consumers only if it agreed not to operate the plant. Ioday, a perfectly good facility, capable of servicing hundreds of thousands of homes, sits rusting.
21.The authors attitude toward the development of nuclear power is______.
A. negative B. neutral
C. positive D. questioning
22.What has made the procedure for licensing nuclear power plants a bad dream?
A. The inefficiency of the Nuclear Regulation Commission. B. The enormous cost of construction and operation.
C. The length of time it takes to make investigations.
D. The objection of the opponents of nuclear power.
23.It can be inferred from Paragraph 2 that______.
A. there are not enough safety measures in the U. S. for running new nuclear power plants
B. it is not technical difficulties that prevent the building of nuclear power plants in the U. S.
C. there are already more nuclear power plants than necessary in the U. S.
D. the American government will not allow Japanese nuclear reactors to be installed in the U. S.
24. Governor Mario Cuomos chief intention in proposing the settlement was to_______.
A. stop the Shoreham plant from going into operation
B. urge the power company to further increase its power supply
C. permit the Shoreham plant to operate under certain conditions
D. help the power company to solve its financial problems
25. The phrase single out is closest in meaning to_______.
A. delay
B. end up
C. complete
D. separate
小升初英语练习题及答案解析(一):语法巩固、完型精炼
牛津小学英语6A Unit1 Public signs单元提高试卷
小升初英语必考考点:小学PEP英语句型(1-20)
小升初英文奥数试题(二)
六年级英语综合练习(2)和答案
牛津小学英语6A Unit1过关测试
北京小升初英语试卷:突击训练题及答案(3)
小升初英文奥数试题(三)
小升初英文奥数试题(一)
小学英语复习计划:复习要点
北京小升初英语试卷:模拟冲刺试题及答案(2)
北京小升初英语试卷:突击训练题及答案(2)
六年级英语周末练习2006-3-14
小升初英文奥数试题(四)
2012年小升初英语试题及答案(上)
小升初英语必考考点:动词do及have/has用法口诀用法口诀
北京小升初英语试卷汇总
小升初英语试卷:口语练习
六年级综合复习题(3)及答案
六年级英语模拟试卷2006-6-9
小学英语六年级调研试卷
小升初英语试卷:巩固练习题
小学英语六年级综合练习(5)及答案
小升初英语试卷:典型句型
小升初英语必考考点:学习记忆有趣顺口溜和小窍门
备考指导:小升初考试前注意事项
小升初英语必考考点:There be句型用法口诀
小升初英语试卷:时态练习题汇总
小升初英语试卷:重点句型复习
六年级英语测试2006-3-27
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |