standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
广东省连州市连州中学高三英语《阅读理解推断作者观点态度》课件
广东省连州市连州中学高三英语模拟操练71-80 课件
两大名校最新研究:原来我们已经没有隐私!
广东省连州市连州中学高三英语模拟操练61-70 课件
广东省连州市连州中学高三英语《阅读理解推断文章的写作目的》课件
广东省连州市连州中学高三英语专题复习:高考英语易错题汇编(2)
2017年高三高考复习必练教程:动词及动词短语(1)1
广东省连州市连州中学高三英语专题复习:高三英语读写任务模拟操练
2017年高考英语专题检测:备考专练-完形填空
2017年高三高考复习必练教程:动词及动词短语(4)
广东省连州市连州中学高三英语《阅读理解确定文章标题》课件
资深演讲者告诉你:运用这5个技巧最能打动人心
广东省连州市连州中学高三英语专题复习:高考英语写作中使用频率较高的词语
广东省连州市连州中学高三英语模拟操练 41-50 课件
2017年高三高考复习必练教程:动词及动词短语(3)
2017年高考英语专题检测练习-单项选择
广东省连州市连州中学高三英语《语法填空技巧与方法》课件
广东省连州市连州中学高三英语专题复习:高考英语错题汇编(1)
广东省连州市连州中学高三英语《阅读理解事实细节》课件
广东省连州市连州中学高三英语专题复习:不规则名词复数+形容词+动词
广东省连州市连州中学高三英语《阅读理解推断词句意义》课件
2017年高三高考复习必练教程:动词及动词短语(2)
2017年高考英语专题检测:备考专题训练解析-阅读理解
2017年高考英语专题检测:备考专题训练-书面表达
广东省连州市连州中学高三英语专题复习:高考英语作文素材精选范文40篇(一)
广东省连州市连州中学高三英语《主谓一致》课件
广东省连州市连州中学高三英语《阅读理解推断下续内容》课件
广东省连州市连州中学高三英语《阅读理解推测隐含意义》课件
广东省连州市连州中学高三英语《阅读理解推断文章出处》课件
广东省连州市连州中学高三英语专题复习:高考英语作文素材精选范文40篇(三)
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |