standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
2016届高考英语二轮复习专项训练:专题限时检测(22)阅读理解词义猜测类之单词意义猜测题
2016届高考英语二轮复习专项训练:非选择题专练卷(2)
2016届高考英语二轮复习专项训练:任务型阅读与书面表达组合卷(4)
2016届高考英语二轮复习专项训练:专题限时检测(2)形容词、副词和介词(短语)
2016届高考英语二轮复习精讲学案:专题02 代词(原卷版)
2016届高考英语二轮复习专项训练:非选择题专练卷(4)
2016届高三英语二轮复习课件:专题5 书面表达 第1节 第8讲 如何写议论文
2016届高考英语二轮复习专项训练:非选择题专练卷(5)
2016届高考英语二轮专项复习课件:Book4 4.5(新人教版)
2016届高考英语二轮复习专项训练:专题限时检测(16)阅读理解细节理解类之正误判断题
2016届高考英语二轮复习专项训练:专题限时检测(14)完形填空之说明文体和议论文体
2016届高考英语二轮复习精讲学案:专题04 动词及动词短语(原卷版)
2016届高考英语二轮复习精讲学案:专题03 形容词和副词(原卷版)
2016届高考英语二轮复习专项训练:专题限时检测(11)完形填空之记叙文体(2)
2016届高考英语二轮复习专项训练:专题限时检测(10)完形填空之记叙文体(1)
2016届高考英语二轮复习专项训练:专题限时检测(18)阅读理解推理判断类之观点态度题
2016届高考英语二轮复习专项训练:选择题专练卷(4)
2016届高考英语二轮复习专项训练:专题限时检测(8)特殊句式及其他
2016届高考英语二轮复习专项训练:专题限时检测(4)时态和语态
2016届高三英语二轮复习课件:专题5 书面表达 综述 高考作文如何判分
2016届高考英语二轮复习专项训练:专题限时检测(9)情景交际
2016届高考英语二轮专项复习课件:Book5 5.1(新人教版)
2016届高考英语二轮复习专项训练:专题限时检测(19)阅读理解推理判断类之写作意图题
2016届高考英语二轮复习精讲学案:专题05 介词与介词短语(原卷版)
2016届高考英语二轮复习专项训练:专题限时检测(12)完形填空之夹叙夹议文体(1)
2016届高考英语二轮复习专项训练:专题限时检测(5)非谓语动词
2016届高考英语二轮专项复习课件:Book5 5.4(新人教版)
2016届高考英语二轮专项复习课件:Book5 5.3(新人教版)
2016届高考英语二轮复习专项训练:任务型阅读与书面表达组合卷(3)
2016届高考英语二轮复习专项训练:专题限时检测(1)名词、冠词和代词
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |