standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
英语诗歌:Honeysuckle(忍冬)
电影行业英语5
英语文摘:预防非典型性肺炎的有效方法
医务英语之女性疾病常用的英语
英语文摘:母亲的心情记录
实用导游英语口语之代人订票
英语科普文选:什么是纳斯达克
电影行业英语2
法律英语之ACCOUNTING AFFAIRS(3)
让四、六级见鬼去吧!-疯狂英语创始人李阳
医务英语之病人常用语的英文表达
电影行业英语3
英语科普文选:Internet(互联网)
房地产英语之代理费用
医院实用口语之医务人员常用英语
实用导游英语口语之旅程安排
房地产英语之讨价还价
房地产英语之协商租赁条件
法律英语之BUILDING OF HOUSE PROPERTY(1)
电影行业英语1
美媒选出2016最值得旅游胜地:中国杭州上榜
中国人应怎样学英语
法律英语之BUILDING OF HOUSE PROPERTY(3)
漫谈英语阅读能力的培养(二)
房地产英语之看房子
英语诗歌:爱之物语
学习外语的十条经验
英语诗歌:Loves Witness(爱情的见证)
房地产英语之申请按揭手续
医务英语之SARS Worsens Jobless Situation
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |