standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
2017届高考英语(课标全国)一轮复习课件:写作提升 第13讲
2017年高考英语语法复习专题巧突破 第一部分 专项专讲:情态动词和虚拟语气(含2017试题)
2017年高考英语语法复习专题巧突破 第一部分 专项专讲:介词(短语)(含2017试题)
2017届高三(人教版)英语复习全国通用活页作业19
2017届高考英语一轮复习单元提升:选修10 Unit 3、4(译林版)
2017届高考英语一轮复习单元提升:必修1 Unit 2 Growing pains(译林版)
2017届高三(人教版)英语复习全国通用活页作业36
2017届高考英语(课标全国)一轮复习课件:写作提升 第11讲
2017届高三(人教版)英语复习全国通用活页作业38
2017届高三(人教版)英语复习全国通用活页作业40
2017年高考英语语法复习专题巧突破 第一部分 专项专讲:动词和动词短语(含2017试题)
2017届高三(人教版)英语复习全国通用活页作业33
2017届高三(人教版)英语复习全国通用活页作业21
中情局黑客工具与16个国家的40起网络攻击有关
2017届高三(人教版)英语复习全国通用活页作业34
2017届高考英语一轮复习单元提升:选修6 Unit 2 What is happiness to you(译林版)
2017届高三(人教版)英语复习全国通用活页作业26
2017届高考英语一轮复习单元提升:选修8 Unit 2 The universal language(译林版)
2017年高考英语语法复习专题巧突破 第二部分 专项专练: 情态动词和虚拟语气(含详解,含押题)
2017届高三(人教版)英语复习全国通用活页作业32
2017届高三(人教版)英语复习全国通用活页作业22
2017届高三(人教版)英语复习全国通用活页作业28
2017届高考英语一轮复习单元提升:选修9 Unit 1、2(译林版)
2017届高三(人教版)英语复习全国通用活页作业35
2017年高考英语语法复习专题巧突破 第二部分 专项专练: 动词和动词短语(含详解,含押题)
2017届高三(人教版)英语复习全国通用活页作业27
2017届高考英语一轮复习单元提升:必修1 Unit 1 School life(译林版)
2017届高考英语(课标全国)一轮复习课件:写作提升 第12讲
2017届高三(人教版)英语复习全国通用活页作业31
2017年高考英语语法复习专题巧突破 第二部分 专项专练: 名词、冠词和代词(含详解,含押题)
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |