In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. Which of these statements is TRUE of system building?
A. It employs more men.
B. It is difficult and dangerous.
C. It can save both time and money.
D. It means less mechanization.
2. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. What lifts the concrete panels onto the building?
A. Cranes.
B. Man-power.
C. Pulleys.
D. Hydraulic jacks.
5. The usual fixed length in the modular system is_______.
A. twenty centimeters
B. ten millimeters
C. fifty centimeters
D. ten centimeters
参考答案:
1. C 2.A 3. B 4. A 5. D
2020届广东梅州市富力足球学校高一英语下学期月考试题
2020届浙江省湖州中学高二英语下学期月考试题
2020届四川南充高级中学高一英语下学期月考试题答案
2020届四川南充高级中学高一英语下学期月考试题
2019-2020深圳大学师范学院附属中学九年级下3月月考试题
2019-2020河南实验中学七年级下3月考试英语试题
2020届广东梅州市富力足球学校高一英语下学期月考试题答案
2019-2020甘肃凉州区皇台中学七年级下第一次月考英语试题答案
2019-2020江苏东台市实验中学城东分校七年级下第一次检测英语试题
2019-2020江苏沭阳县修远中学七年级下第一次月考英语试题答案
2019-2020陕西西安西航二中七年级下英语检测题答案
2020届湖南长沙明德中学高一英语下学期测试题
2019-2020山东莒县果庄中学八年级下第二次月考英语试题
2020届辽宁瓦房店市实验高级中学高二英语下学期月考试题
2019-2020湖北黄冈学年五校联考七年级下英语4月模拟试题(
2019-2020陕西凤翔竞存中学八年级4月月考英语试题
2019-2020江苏东台实验中学城东分校八年级下第一次学情检测英语试题答案
2020届陕西延安新区高级中学高二英语下学期月考试题
2020届黑龙江安达市七中高二英语下学期月考试题
2019-2020江苏射阳县第二初级中学七年级下4月英语试题答案
2019-2020江省海安市八校七年级4月测试英语试题
2019-2020海南海口十四中八年级下第一次月考英语试题答案
2019-2020江苏沭阳县修远中学七年级下第一次月考英语试题
2019-2020广东深圳龙城中学八年级4月测试英语试题
2019-2020广东汕头潮南区育才实验学校八年级下英语第二次月考答案
2019-2020湖北黄冈学年五校联考七年级下英语4月模拟试题答案
2019-2020北京市一七一中学八年级下英语阶段测试一
2019-2020甘肃凉州皇台学校八年级下第一次月考英语试题
2019-2020甘肃凉州区皇台中学七年级下第一次月考英语试题
2019-2020广东汕头潮南区育才实验学校八年级下英语第二次月考
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |