In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. Which of these statements is TRUE of system building?
A. It employs more men.
B. It is difficult and dangerous.
C. It can save both time and money.
D. It means less mechanization.
2. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. What lifts the concrete panels onto the building?
A. Cranes.
B. Man-power.
C. Pulleys.
D. Hydraulic jacks.
5. The usual fixed length in the modular system is_______.
A. twenty centimeters
B. ten millimeters
C. fifty centimeters
D. ten centimeters
参考答案:
1. C 2.A 3. B 4. A 5. D
中考英语:中学英语词汇快速记忆法
中考英语语法巧记口诀汇总
中考英语复习:英语800句让你记住7000个单词8
初三英语期中考试备战:九年级上Unit 1-5易混词语
中考英语复习:999句最常用英语口语
初中英语语法动词八种时态详解:现在进行时
初中英语语法动词八种时态详解:将来进行时
初三英语完形填空专项练习题30
初中英语期末考试写作常用词汇集锦
初三英语完形填空专项练习题12
中考英语单项选择之命题特点及相应对策
初三英语完形填空专项练习题16
中考英语学习提高:完形填空难题精练
中考英语写作素材 环保英语词汇
中考复习必备:英语核心句型50例
初三英语完形填空专项练习题29
中考英语重点句型42例
中考英语复习:英语800句让你记住7000个单词2
初三英语完形填空专项练习题22
初三英语完形填空专项练习题13
初三英语专题讲解 词汇辨析2
初中英语考点总结——动词不定式“特例”大搜捕
初三英语完形填空专项练习题5
初中英语语法动词八种时态详解:过去进行时
初三英语专题讲解 词汇辨析1
名师指点:四招让学生快速记忆英语单词
怎样才能学好初中英语语法?
中考英语复习:大学英语四级单词提前预热
初三英语完形填空专项练习题26
看世界杯 学单词
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |