In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. Which of these statements is TRUE of system building?
A. It employs more men.
B. It is difficult and dangerous.
C. It can save both time and money.
D. It means less mechanization.
2. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. What lifts the concrete panels onto the building?
A. Cranes.
B. Man-power.
C. Pulleys.
D. Hydraulic jacks.
5. The usual fixed length in the modular system is_______.
A. twenty centimeters
B. ten millimeters
C. fifty centimeters
D. ten centimeters
参考答案:
1. C 2.A 3. B 4. A 5. D
雅思听力定位就靠逻辑关联词
考生分享雅思听力8分的11个秘诀(上)
详解雅思听力考试中的同义转换
雅思听力考试中常见的国籍词汇
雅思听力地图题介绍及解题技巧指导
雅思听力高分 读猜听写查是必备
解析雅思听力中的缩写词:字母、图像
如何解决雅思听力流动语感不敏感的问题
灵活利用雅思听力考试的每一分钟
雅思听力考试的三种备考方案
雅思听力:养成良好听力习惯的重要性
雅思听力数字考点之基本数字
不同目标考生的雅思听力备考方案
给新手的14个雅思听力tips
突破雅思听力高分的三大备考方针
解读雅思听力的四种替换规律
雅思听力英语资讯练习步骤全解析
雅思听力简化笔记符号、缩略词大全
雅思听力备考如何把握语音关
提升雅思听力水平需提高的两个方面
雅思听力练习好素材:英语资讯
最直接的雅思听力提高方法
雅思听力材料的选择和练习方法介绍
三大练习方法轻松应对雅思听力考试
半个月提高雅思听力水平的练习方法
雅思听力考点对策讲解:号码
雅思听力考试中的7类信号词
雅思听力词汇的两种基本备考方案
雅思听力考试需要每句话都听懂吗?
雅思听力最常见的60个核心词汇
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |