In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. Which of these statements is TRUE of system building?
A. It employs more men.
B. It is difficult and dangerous.
C. It can save both time and money.
D. It means less mechanization.
2. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. What lifts the concrete panels onto the building?
A. Cranes.
B. Man-power.
C. Pulleys.
D. Hydraulic jacks.
5. The usual fixed length in the modular system is_______.
A. twenty centimeters
B. ten millimeters
C. fifty centimeters
D. ten centimeters
参考答案:
1. C 2.A 3. B 4. A 5. D
外企必备英语口语(12)
职场实用英语口语(5)
职场英语情景交际之秘书给主任捎口信
外企工作必备英语口语精讲(2)
职场英语情景交际之办公室午餐时间帮同事带快餐
职场英语情景交际之英国上班族下班兼职当乞丐
外企工作必备英语口语精讲(1)
外企必备英语口语(5)
外企必备英语口语:用英语介绍自己和介绍别人
辨别身份:外企常用英语口语300句
职场英语口语百科:be on cloud nine
外企工作必备英语口语精讲(4)
职场英语情景交际之同事之间抱怨第三服务商的服务质量
用英职场美语视频:语做正式的请求Making more formal requests
职场英语口语百科:be over the hump
外企必备英语口语:寻求帮助
职场英语情景交际之部分程序被人修改了
外企必备英语口语:用英语谈论某事的日期和时间安排
外企必备英语口语(11)
职场英语情景交际之如何从9份面试中得到10份offer
职场实用英语口语(1)
职场英语情景交际之公司接待接待约见拜访者
职场英语情景交际之垃圾邮件真烦人
外企必备英语口语(9)
外企工作必备英语口语精讲(3)
职场实用英语口语(2)
职场英语口语百科:be on pins and needles
职场英语情景交际之八卦新上司有外遇
职场英语情景交际之工作还没做完还不能去吃饭
职场英语情景交际之询问同事老板去向
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |