In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. Which of these statements is TRUE of system building?
A. It employs more men.
B. It is difficult and dangerous.
C. It can save both time and money.
D. It means less mechanization.
2. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. What lifts the concrete panels onto the building?
A. Cranes.
B. Man-power.
C. Pulleys.
D. Hydraulic jacks.
5. The usual fixed length in the modular system is_______.
A. twenty centimeters
B. ten millimeters
C. fifty centimeters
D. ten centimeters
参考答案:
1. C 2.A 3. B 4. A 5. D
漫话雅思阅读文章结构人文社科类
浅议雅思阅读多选题之同题异做
雅思听力题型技巧分享复杂表格
四大绝招助考雅思生稳拿阅读的高分
重磅推荐2010年雅思口语考试七大看点
攻克语法绊脚石巧取雅思写作高分三大法则
雅思口语你所不知道的考试技巧
2010年雅思口语考情预测备考指导
2010年雅思写作考试趋势预测和备考指导
雅思口语最易被人误解七件事
助考雅思口语考试常用短句分享
名师支招应对雅思听力考试4步曲
雅思词汇梳理经久不衰的动植物TOPIC
名师指导雅思听力备考策略三步走
指导浅谈雅思阅读中的关系词
雅思妙招按场景分类识记听力词汇
名师讲解雅思阅读两大备战方案
雅思听力备考关键最后一堂课的份量
名师教你怎样打好雅思考试“心理战”
“烤鸭”超值分享雅思6分保命100句
对战雅思在阅读中的如何运用常识
雅思口语Part2中最难10道题
过来人分享雅思听力考试的评分标准
经验汇总通往雅思成功之门
雅思名师如何应对听力考试中的填空题
名师点评2010年雅思考试真题
雅思支招口语Part1中最难10道题
雅思小标题定位词的选择技巧
雅思阅读指南让“是非”变得简单
雅思阅读问题解析摘要类型题
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |