In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer B. buildings are made from a set of standardized units
C. similar buildings can be produced D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks.
答案: A C B D A
2018-2019福建福州台华晋华九年级上英语期中试题
2018-2019河北石家庄十七中九年级上英语期中试题
2018-2019浙江杭州三墩中学九年级上英语期中试题
2018-2019福建福州十八中九年级上英语期中试题
2019-2020天津红桥九年级上英语期中试题
2018-2019江苏仪征三中九年级上英语期中试题答案
2018-2019福建福州台华晋华九年级上英语期中试题答案
2018-2019广东深圳坪山初一下英语期末教学质量检测
2018-2019福建福州英才中学九年级上英语期中试题
2018-2019上海杨浦初三上英语期中试卷
2018-2019贵州贵阳普通中学七年级上英语期末试卷
2018-2019湖南安仁龙市中学九年级上英语期中试题
2018-2019浙江诸暨开放双语实验学校九年级上英语期中试卷
2018-2019山东济宁任城九年级上英语期中试题
2018-2019陕西渭南华州九年级上英语期中试题
2018-2019湖南娄底涟源九年级上英语期中试题
2018-2019河南洛阳七年级上英语请期末试题
2018-2019云南临沧凤庆腰街中学九年级上英语期中试卷
2019-2020浙江乐清九年级上英语期中试卷答案
2018-2019陕西商南富水中学九年级上英语期中试题
2018-2019湖南娄底涟源九年级上英语期中试题答案
2018-2019陕西西安临潼七年级上英语期末测试
2018-2019甘肃白银育才学校七年级下英语期末试题
2018-2019福建福州十六中九年级上英语期中试题
2018-2019湖南武冈二中九年级上英语期中试题
2018-2019四川泸州江阳七年级上英语期末试题
2018-2019山东滕州鲍沟中学九年级上英语期中试题答案
2018-2019江苏阜宁九年级上英语期中试题
2018-2019江苏仪征三中九年级上英语期中试题
2018-2019河北保定新南开外国语中学七年级上英语期末试题
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |