In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer B. buildings are made from a set of standardized units
C. similar buildings can be produced D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks.
答案: A C B D A
四级听力考试技巧:四级听力小对话九种题型必胜的技巧
24日大学英语四级考试听力的附试题和答案
英语四级的听力中常考的同音词与近音词
地点、职业、人物的关系类
否定与判断类的题型
大学四级英语考试短文听力的训练办法
大学英语考试四级听力考前的辅导(4)
英语听力的学习之我见
如何巩固四级的听力
听力试题的命题规律和解题的技巧
短文听力理解解题的技巧
历年四级听力真题分析及命题的预测(上)
大学生提高听力的水平应注意的几个问题
地点与方向的类型
大学英语四级考试听力附试题和答案
四级听力考试中大家要注意的七类的关键词
我是怎样提高英语听力的呢
大学英语四级听力应试的技巧
大学英语考试四级听力考前的辅导(3)
大学英语考试四级听力考前的辅导(2)
四级考试的“复合式听写”
共同的解题的技巧
提高听力能力的语言因素和知识的因素
大学英语考试四级听力考前的辅导(1)
大学大学英语四、六级填空式听写的技巧
听力对话神蒙的原则
1998年1月大学英语四级考试听力的附试题和答案
英语的听力:课下重积累考试巧应对
四六级听力的要诀:先看后听把握节奏沉着应战
如何形成听力的“条件反射”呢?
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |