In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
2. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer B. buildings are made from a set of standardized units
C. similar buildings can be produced D. all units are produced on the site
4. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters
5. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks.
答案: A C B D A
北京四中初三内部训练试题阅读解析
初三英语作文:Serious Floods
初二英语阅读题专项练习:圣诞节礼物
初二英语阅读题专项练习:古人的生活
初二英语阅读题专项练习:因特网的历史
初二英语阅读题专项练习:18岁以下禁入酒吧
初中三年级英语阅读 阅读理解及答案解析(四)
我想要快乐I Want to be Happy
初中二年级英语阅读 阅读理解(一)
初三英语作文题目:上学路上
初三英语作文:My Dream School_800字
初三英语作文:中国的教育Chinese Education
初中三年级英语阅读 阅读理解及答案解析(一)
初三英语作文:假如我有时光机 If I Had a Time Machine
初二英语阅读题专项练习:风筝的来源
人大附中初三英语阅读理解解析
初三英语作文范文:做三明治的过程
初三英语作文:描写春雨 Spring RainSpring Rain
初中二年级英语阅读 阅读理解(三)
初中二年级英语阅读 阅读理解(二)
初三英语作文:通电话
初三英语阅读理解模拟试题
初二英语阅读题专项练习:梦
初中三年级英语阅读 阅读理解及答案解析(七)
初三英语作文:保持健康的方法
初中三年级英语阅读 阅读理解及答案解析(八)
初中三年级英语阅读 阅读理解及答案解析(十)
初三英语作文:犀牛rhinoceroses
2013中考英语阅读真题特训及答案解析
初二英语阅读题专项练习:单词意义的转变
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |