In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. Which of these statements is TRUE of system building?
A. It employs more men.
B. It is difficult and dangerous.
C. It can save both time and money.
D. It means less mechanization.
2. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. What lifts the concrete panels onto the building?
A. Cranes.
B. Man-power.
C. Pulleys.
D. Hydraulic jacks.
5. The usual fixed length in the modular system is_______.
A. twenty centimeters
B. ten millimeters
C. fifty centimeters
D. ten centimeters
参考答案:
1. C 2.A 3. B 4. A 5. D
SAT阅读:Dopamine and Learning
SAT阅读官方练习题
如何应对SAT考试长篇阅读
SAT阅读材料:Trauma Teddies
SAT阅读素材 unsolved math problems
SAT阅读的题材问题解析
sat阅读:Speech and Harm and SAT Trick
SAT阅读材料:How We Learn
SAT阅读高分攻略系列(十一):短篇阅读
SAT阅读素材:Modern urban design
SAT阅读应该遵循的基本原则
SAT阅读素材:Hoover Dam Architectural style
SAT阅读扩展:Immanuel Kant
SAT阅读长难句学习要点
SAT阅读材料 gene regulatory network
SAT阅读全面解析
SAT阅读题练习
突破SAT阅读长难句是拿高分的重点
SAT阅读高分攻略系列(四)
SAT阅读资料:Dopaminergic mind hypothesis
跟专家学习SAT阅读长难句
如何提高SAT阅读应试能力
SAT阅读高分宝典 篇章部分
SAT官方指南阅读习题五
SAT阅读中修辞手法的使用:低调陈述
如何深入理解SAT考试阅读题
SAT短篇阅读实例讲解第二篇
专家解读如何构建SAT阅读思维 攻克阅读难题
SAT阅读材料:A Brief History of Western Music
初三和高一的学生如何备考SAT阅读?
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |