In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. Which of these statements is TRUE of system building?
A. It employs more men.
B. It is difficult and dangerous.
C. It can save both time and money.
D. It means less mechanization.
2. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. What lifts the concrete panels onto the building?
A. Cranes.
B. Man-power.
C. Pulleys.
D. Hydraulic jacks.
5. The usual fixed length in the modular system is_______.
A. twenty centimeters
B. ten millimeters
C. fifty centimeters
D. ten centimeters
参考答案: 1. C 2.A 3. B 4. A 5. D
雅思口语最新法律话题
雅思口语常用中国特色词汇
最易被忽视的2个雅思口试流程
雅思口语考试常见句型20个
雅思口语拿8分:你要影响考官
雅思口语:如何克服心理紧张感
雅思口语话题变化时间:每年都有三次大变化
20个小谚语 给你的雅思口语加分
雅思口语应对技巧:申请不止 套词不断
搜集雅思口语话题的三个原则
雅思考前冲刺:口语中短期备考
雅思口语生活词汇:美妆美发(3)
雅思口语大忌:勿把资料倒背如流
雅思考试口语7.5经验谈
高分秘籍 雅思口语8分综合训练
雅思口语实用攻略:考前如何调整状态
名师:雅思口语考试之情商篇
雅思口语食物词汇:家禽类(1)
步步“精”心话留学 雅思口语莫要“文绉绉”
电话英语:三项准备攻克雅思考试英语口语
实力加技巧 提高雅思口语成绩
雅思口语食物词汇:水果类(3)
雅思口试内容已趋向商业化
雅思口语7分 坚持就是胜利
雅思口语考试高分备考:考前如何调整状态
雅思口语词汇:教育(1)
雅思口语高分句式之定语从句
电话英语练好雅思口语发音
雅思口语词汇:教育(6)
三大类雅思口语分数段考生备考对策
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |