In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. Which of these statements is TRUE of system building?
A. It employs more men.
B. It is difficult and dangerous.
C. It can save both time and money.
D. It means less mechanization.
2. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
3. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
4. What lifts the concrete panels onto the building?
A. Cranes.
B. Man-power.
C. Pulleys.
D. Hydraulic jacks.
5. The usual fixed length in the modular system is_______.
A. twenty centimeters
B. ten millimeters
C. fifty centimeters
D. ten centimeters
参考答案: 1. C 2.A 3. B 4. A 5. D
如何提高英语听力
赵丽教你巧记英语单词LESSON 8
赵丽教你巧记英语单词LESSON 44
如何提高英语听力技巧
大学英语四级词汇f
英语听力练习的基本准则
英语听力教材巧选择
赵丽教你巧记英语单词LESSON 4
提高英语听力 找对方法是关键
如何练习听力?
2008年6月四级预测卷听力(星火)第7课
赵丽教你巧记英语单词LESSON 6
赵丽教你巧记英语单词LESSON 20
CET4淘金式英语词汇(四级)第3课
大学英语四级词汇k
赵丽教你巧记英语单词LESSON 50
大学英语四级词汇e
英语听力训练你要知道的事情
赵丽教你巧记英语单词LESSON 36
赵丽教你巧记英语单词LESSON 23
VOA学习中的一些经验和体会
不能错过的最实用听力练习法
2008年6月四级预测卷听力(星火)第4课
大学英语四级词汇o
听译牛人传授真经:听就一个字!
用“精听”提高英语听力水平
赵丽教你巧记英语单词LESSON 16
八点英语听力建议
如何用美剧真正提升你的英语水平
新四级听力听写练习第一单元Lesson01
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |