In the early days of nuclear power, the United States make money on it. But today opponents have so complicated its development that no nuclear plants have been ordered or built here in 12 years.
The greatest fear of nuclear power opponents has always been a reactor meltdown. Today, the chances of a meltdown that would threaten U. S. public health are very little. But to even further reduce the possibility, engineers are testing new reactors that rely not on human judgment to shut them down but on the laws of nature. Now General Electric is already building two advanced reactors in Japan. But dont expect them even on U. S. shores unless things change in Washington.
The procedure for licensing nuclear power plants is a bad dream. Any time during, or even after, construction, an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court. Meanwhile, the builder must add nice-but-not-necessary improvements, some of which force him to knock down walls and start over. In every case when a plant has been opposed, the Nuclear Regulation Commission has ultimately granted a license to construct or operate. But the victory often costs so much that the utility ends up abandoning the plant anyway.
A case in point is the Shoreham plant on New Yorks Long Island. Shoreham was a virtual twin to the Millstone plant in Connecticut, both ordered in the mid-60s. Millstone, completed for $ 101 million, has been generating electricity for two decades. Shoreham, however, was singled out by antinuclear activists who, by sending in endless protests, drove the cost over $ 5 billion and delayed its use for many years.
Shoreham finally won its operation license. But the plant has never produced a watt power. Governor Mario Cuomo, an opponent of a Shoreham start up, used his power to force New Yorks public-utilities commission to accept the following settlement: the power company could pass the cost of Shoreham along to its consumers only if it agreed not to operate the plant. Ioday, a perfectly good facility, capable of servicing hundreds of thousands of homes, sits rusting.
21.The authors attitude toward the development of nuclear power is______.
A. negative B. neutral
C. positive D. questioning来自www.Examw.com
22.What has made the procedure for licensing nuclear power plants a bad dream?
A. The inefficiency of the Nuclear Regulation Commission. B. The enormous cost of construction and operation.
C. The length of time it takes to make investigations.
D. The objection of the opponents of nuclear power.
23.It can be inferred from Paragraph 2 that______.
A. there are not enough safety measures in the U. S. for running new nuclear power plants
B. it is not technical difficulties that prevent the building of nuclear power plants in the U. S.
C. there are already more nuclear power plants than necessary in the U. S.
D. the American government will not allow Japanese nuclear reactors to be installed in the U. S.
24. Governor Mario Cuomos chief intention in proposing the settlement was to_______.
A. stop the Shoreham plant from going into operation
B. urge the power company to further increase its power supply
C. permit the Shoreham plant to operate under certain conditions
D. help the power company to solve its financial problems
25. The phrase single out is closest in meaning to_______.
A. delay B. end up
C. complete D. separate
21. C 22. D 23. B 24. A 25. D
新gre数学考点介绍:排列
GRE和GMAT数学常考数学公式介绍
新gre数学考点:Substitution
新gre数学考点介绍:AT least One
新gre数学考点介绍:AP
GRE数学数据解释题型重点试题(二)
十个新GRE数学易错题解析
新GRE数学疑难问题解答思路
新GRE数学词汇汇总:J—O
新GRE数学考点:Sum of Arithmetic Progression
新gre数学考点介绍:并集和交集
GRE数学备考经验介绍
解析新GRE数学正态分布题型
新gre数学考点介绍:Combinations of Choices
新GRE数学考点:Set
GRE数学常考知识点介绍(下)
新gre数学考点介绍:Sequence of Numbers
GRE数学数据解释题型重点试题(五)
GRE数学备考的12个基本考点
GRE数学疑难问题解答思路
GRE数学考试中常用的检查方法
关于GRE数学专项考试的问题解答
新GRE数学词汇汇总:P—R
新GRE数学几何考题练习
新gre数学考点介绍:Set
新gre数学考点介绍:set、排列、组合
新GRE数学疑难问题列举解答
新GRE数学105道易错题汇总(机经类)
GRE数学数据解释题型重点试题(三)
新GRE数学模拟练习题
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |