The process by which bricks are manufactured for the building industry can be outlined in seven consecutive steps. First the raw material, clay, which was just below the surface of soil in certain clay-rich areas has to be dug up by a digger.
Then the lumps of clay are placed on a metal grid in order to break up the big chunks of clay into much smaller areas, which fall through the metal grid onto a roller, whose motion further segregates the bits of clay. Sand and water are added to make a homogenous mixture, which is then either formed in moulds or cut into brick-shaped pieces by means of a wire cutter.
Those fresh bricks are then kept in a drying oven for at least 24 and a maximum of 48 hours, several dozens if not hundreds of bricks at a time. The dried bricks are then transferred to a so-called kiln, another type of high temperature oven. First they are kept at a moderate temperature of 200 ℃ -1300 ℃ . This process is followed by cooling down the finished bricks for 48 to 72 hours in a cooling chamber.
Once the bricks have cooled down and have become hard, they get packaged and delivered to their final destination, be it a building site or storage.
高效备考GMAT数学的方法总结
GMAT数学解题辅导:5大数学思维
GMAT数学答题有哪些常见的技巧
GMAT数学难点如何应对
GMAT数学入门需要了解哪些事儿
GMAT数学复习有哪些细节
GMAT数学备考五项原则
GMAT数学成绩提高可从五方面入手
GMAT数学常考定理归纳
GMAT数学失分原因:思维陷阱
GMAT数学满分的备考方法介绍
GMAT数学词汇如何准备
GMAT数学短期如何冲刺
GMAT数学倍数如何表达
如何有效避免GMAT数学上的逻辑误区
整理GMAT数学中常考题型
GMAT数学知识点讲解:算术和数论
GMAT数学失分原因:做题不仔细
GMAT数学机经应该怎么用
GMAT数学常见失分点剖析
GMAT数学失分原因:英文理解不清晰
GMAT数学基础知识介绍:几何知识
解读GMAT数学备考的三个阶段
GMAT数学机经的作用和使用方法
GMAT数学求余数技巧简介
GMAT数学实用答题技巧总结
GMAT数学排列组合类题目解答技巧
GMAT数学考试常见错误分析
GMAT数学基础知识介绍:统计
GMAT数学复习资料介绍
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |