ELECTRONICS ENGINEER(Experienced)
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
BACKGROUND SUMMARY
Over eleven years of extensive computer/electronics experience.Versed in both digital and analog electronics withspecific emphasis on computer hardware/software.Special expertise in system and component evaluation.Network supervisor responsible for installing/maintaining Arcnet LAN system.Proficient in assembly and C programming languages.Excelent communication skills including written,verbal and interpersonal.
PROFESSIONAL WORK EXPERIENCE
Stevenson Data Systems,Los Angeles,CA 1981-1993
Components Evaluation Engineer 1992-1993
Responsible for the characterization and evaluation of, and approved vendors list for:Power supplies,oscillators,crystals,and programmable logic used in desktop and laptop computers.Evaluated and recommended quality components that increased product profitability.Created adn developed power supply test plan used for evqluating third party power supplies.Interacted with vendors to resolve problems associated with components qualification.Technical advisor for Purchasing.Promoted to engineer II.
Design Evaluation Engineer 1990-1992
Evaluated new computer product designs ,solving environmental problems on prototype computers.Conducted systems analysis on new computer profucts to ensure hardware,software and mechanical design integrity.Designed hardware and software for PC,ISA bus programmable load board used for environmental testing.Performed reliability lift testing on computer systems.Installed/maintained 20 user.Novell,Arcnet LAN system.Examined system and sub-system susceptibility to electrostatic discharge in order to meet IEC-801-2 industry standards.Analyzed complete power and load of computer system and subsystem to verify power and load estimations.
Assistant Engineer 1981-1990
Performed extensive hardware evaluation ion prototype computers,tested prototype units for timing violation using the latest state-of-the-art test equipment,digital oscilloscopes and logic analyzers.Performed emvironmental,ESD and acoustic testing.Designed and built a power-up test used to test prototype computers during cold boot.
EDUCATION
Bachelor of Science in Electrical Engineering
--University of Southern California 1990
Associate in Engineering Electronics
--University of Southern California 1981
Job descriptions emphasize candidate's accomploshments.
Work history is stated in reverse chronological order,with most recent employment listed first.
牛津沈阳版英语七上Module 1《Unit 1 What will I be》word同步测试
牛津沈阳版英语七上Module 1《Unit 2 Seasonal changes》word同步测试
牛津沈阳版七年级英语上册单元测试-月考
牛津上海版英语七下Module 2《Unit 1 Writing a tourist guide》word同步测试
牛津译林版七上单元测试-Unit1-6
牛津上海版英语七下Module 3《Unit 4 A more enjoyable school life》word同步测试
牛津上海版英语七下《Unit 3 Santa Claus is coming to town》word同步测试
牛津上海版英语七下Module 4《Unit 1 Electricity today》word词汇专练
牛津译林版英语七上《Unit 1 Hello》word同步测试
牛津上海版英语七上《Unit 3 Travelling in Garden City》word同步测试
牛津上海版英语七下Module 4《Unit 1 Electricity today》word同步练习
七年级上册英语期末试题(牛津译林版)
牛津上海版英语七下《Module 2 Garden City and its neighbours》word全模块同步测试
七年级上册英语期中试题(牛津译林版)
牛津上海版英语七上《Unit 3 Different places》word同步测试(一)
牛津上海版英语七上《Unit 3 Travelling in Garden City》word同步测试(一)
牛津上海版英语七下Module 4《Unit 1 Electricity today》word同步测试
牛津上海版英语七上《Unit 4 Making a model》word同步测试
牛津上海版英语七下Module 4《Unit 2 The wind is blowing词汇专练》word同步测试
牛津译林版七上Starter综合卷
牛津上海版英语七下Module 4《Unit 2 The wind is blowing》word同步测试
牛津上海版英语七下Module 2《Unit 3 Santa Claus is coming to town》word同步测试
牛津深圳版英语七上7.1《Making friends》word同步复习
牛津译林版英语七上《Unit 1 This is me》word同步测试4套
牛津上海版英语七下Module 3《Unit 2 We love all four seasons》word同步测试
牛津上海版英语七下《Unit 1 A surprise birthday party》word同步测试
牛津上海版英语七下Module 4《Unit 3 Water Festival》word同步测试
牛津深圳版英语七上7.1《Making friends》word课堂练习
七年级上册英语期中试题(牛津译林版)2010
牛津译林版英语七上《Unit 11 At the weekend》word同步测试
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |