ELECTRONICS ENGINEER(Experienced)
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
BACKGROUND SUMMARY
Over eleven years of extensive computer/electronics experience.Versed in both digital and analog electronics withspecific emphasis on computer hardware/software.Special expertise in system and component evaluation.Network supervisor responsible for installing/maintaining Arcnet LAN system.Proficient in assembly and C programming languages.Excelent communication skills including written,verbal and interpersonal.
PROFESSIONAL WORK EXPERIENCE
Stevenson Data Systems,Los Angeles,CA 1981-1993
Components Evaluation Engineer 1992-1993
Responsible for the characterization and evaluation of, and approved vendors list for:Power supplies,oscillators,crystals,and programmable logic used in desktop and laptop computers.Evaluated and recommended quality components that increased product profitability.Created adn developed power supply test plan used for evqluating third party power supplies.Interacted with vendors to resolve problems associated with components qualification.Technical advisor for Purchasing.Promoted to engineer II.
Design Evaluation Engineer 1990-1992
Evaluated new computer product designs ,solving environmental problems on prototype computers.Conducted systems analysis on new computer profucts to ensure hardware,software and mechanical design integrity.Designed hardware and software for PC,ISA bus programmable load board used for environmental testing.Performed reliability lift testing on computer systems.Installed/maintained 20 user.Novell,Arcnet LAN system.Examined system and sub-system susceptibility to electrostatic discharge in order to meet IEC-801-2 industry standards.Analyzed complete power and load of computer system and subsystem to verify power and load estimations.
Assistant Engineer 1981-1990
Performed extensive hardware evaluation ion prototype computers,tested prototype units for timing violation using the latest state-of-the-art test equipment,digital oscilloscopes and logic analyzers.Performed emvironmental,ESD and acoustic testing.Designed and built a power-up test used to test prototype computers during cold boot.
EDUCATION
Bachelor of Science in Electrical Engineering
--University of Southern California 1990
Associate in Engineering Electronics
--University of Southern California 1981
Job descriptions emphasize candidate's accomploshments.
Work history is stated in reverse chronological order,with most recent employment listed first.
GMAT备考精华:数学篇(二)
GMAT数学满分多少?得满分难么?
GMAT数学精华题型解析(13)
严崴在线问答汇总:GMAT疑问全解答
GMAT数学:给数学基础不好的同学一点建议
GMAT数学:如何应对数据充分性问题
五大思想在GMAT数学中的应用
GMAT备考辅导:GMAT数学常见名词(1)
满分必看 GMAT数学复习总原则
GMAT数学辅导:算术知识点全解析(标准方差)
GMAT数学求余数的简单方法
GMAT数学:数据填充题应试技巧
经验分享:文科生也能拿GMAT数学满分
GMAT数学必背单词:数学名词大全(一)
GMAT数学掌握基本概念很重要
GMAT数学复习:不可忽视的真相
GMAT数学基本概念知多少?
GMAT数学易错题型总结
GMAT数学满分备考方法
GMAT数学复习的几个重要习惯
看看GMAT数学满分获得者都会啥词儿
GMAT数学备考笔记:概率 数论 整除
GMAT备考精华:数学篇(三)
如何应对GMAT数学中的数据充分性
GMAT数学辅导:算术知识点全解析(中数、众数、值域)
GMAT数学概念和名词汇总(2)
GMAT AWA评分标准详细介绍
GMAT备考精华:数学篇(一)
分享GMAT数学满分的最高机密
GMAT数学辅导:算术知识点全解析(组合)
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |