ELECTRONICS ENGINEER(Experienced)
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
BACKGROUND SUMMARY
Over eleven years of extensive computer/electronics experience.Versed in both digital and analog electronics withspecific emphasis on computer hardware/software.Special expertise in system and component evaluation.Network supervisor responsible for installing/maintaining Arcnet LAN system.Proficient in assembly and C programming languages.Excelent communication skills including written,verbal and interpersonal.
PROFESSIONAL WORK EXPERIENCE
Stevenson Data Systems,Los Angeles,CA 1981-1993
Components Evaluation Engineer 1992-1993
Responsible for the characterization and evaluation of, and approved vendors list for:Power supplies,oscillators,crystals,and programmable logic used in desktop and laptop computers.Evaluated and recommended quality components that increased product profitability.Created adn developed power supply test plan used for evqluating third party power supplies.Interacted with vendors to resolve problems associated with components qualification.Technical advisor for Purchasing.Promoted to engineer II.
Design Evaluation Engineer 1990-1992
Evaluated new computer product designs ,solving environmental problems on prototype computers.Conducted systems analysis on new computer profucts to ensure hardware,software and mechanical design integrity.Designed hardware and software for PC,ISA bus programmable load board used for environmental testing.Performed reliability lift testing on computer systems.Installed/maintained 20 user.Novell,Arcnet LAN system.Examined system and sub-system susceptibility to electrostatic discharge in order to meet IEC-801-2 industry standards.Analyzed complete power and load of computer system and subsystem to verify power and load estimations.
Assistant Engineer 1981-1990
Performed extensive hardware evaluation ion prototype computers,tested prototype units for timing violation using the latest state-of-the-art test equipment,digital oscilloscopes and logic analyzers.Performed emvironmental,ESD and acoustic testing.Designed and built a power-up test used to test prototype computers during cold boot.
EDUCATION
Bachelor of Science in Electrical Engineering
--University of Southern California 1990
Associate in Engineering Electronics
--University of Southern California 1981
Job descriptions emphasize candidate's accomploshments.
Work history is stated in reverse chronological order,with most recent employment listed first.
备考资料:GRE考试历年真题反义词汇总-S
GRE单词速记绝妙八法(下)
备考资料:GRE考试历年真题反义词汇总-Q-R
新gre词汇难度不减
GRE考试:有中国特色的常用词汇十三
GRE考试:有中国特色的常用词汇五
GRE考试:有中国特色的常用词汇六
GRE考试:有中国特色的常用词汇二十一
GRE类反大全(7)
GRE考试:有中国特色的常用词汇二十
整理:GRE单词8字原则(词根词缀)
GRE类反大全(2)
备考资料:GRE常见词根词缀汇总(5)
GRE类反大全(3)
GRE考试:有中国特色的常用词汇二十四
GRE考试:有中国特色的常用词汇十一
GRE考试:有中国特色的常用词汇十七
GRE考试:有中国特色的常用词汇十五
GRE类反大全(10)
GRE单词分类总结(I)
备考资料:GRE考试历年真题反义词汇总-B-C
GRE单词分类总结(X)
GRE考试:有中国特色的常用词汇十九
GRE类反大全(1)
GRE考试:有中国特色的常用词汇八
备考资料:GRE考试历年真题反义词汇总-J-M
GRE考试:有中国特色的常用词汇四
GRE考试:有中国特色的常用词汇二十五
备考资料:GRE考试历年真题反义词汇总-P
让GRE专业学术词汇不再是难题
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |