Hoover Dam Architectural style
The initial plans for the facade of the dam, the power plant, the outlet tunnels and ornaments clashed with the modern look of an arch dam. The Bureau of Reclamation, more concerned with the dams functionality, adorned it with a Gothic-inspired balustrade and eagle statues. This initial design was criticized by many as being too plain and unremarkable for a project of such immense scale, so Los Angeles-based architect Gordon B. Kaufmann, then the supervising architect to the Bureau of Reclamation, was brought in to redesign the exteriors. Kaufmann greatly streamlined the design, and applied an elegant Art Deco style to the entire project. He designed sculptured turrets rising seamlessly from the dam face and clock faces on the intake towers set for the time in Nevada and Arizonathe two states are in different time zones, but as Arizona does not observe Daylight Saving Time, the clocks display the same time for more than half the year.
At Kaufmanns request, Denver artist Allen Tupper True was hired to handle the design and decoration of the walls and floors of the new dam. Trues design scheme incorporated motifs of the Navajo and Pueblo tribes of the region. Although some initially were opposed to these designs, True was given the go-ahead and was officially appointed consulting artist. With the assistance of the National Laboratory of Anthropology, True researched authentic decorative motifs from Indian sand paintings, textiles, baskets and ceramics. The images and colors are based on Native American visions of rain, lightning, water, clouds, and local animalslizards, serpents, birdsand on the Southwestern landscape of stepped mesas. In these works, which are integrated into the walkways and interior halls of the dam, True also reflected on the machinery of the operation, making the symbolic patterns appear both ancient and modern.
With the agreement of Kaufmann and the engineers, True also devised an innovative color coding for the pipes and machinery, which was implemented throughout all BOR projects. Trues consulting artist job lasted through 1942; it was extended so he could complete design work for the Parker, Shasta and Grand Coulee dams and power plants. Trues work on the Hoover Dam was humorously referred to in a poem published in The New Yorker, part of which read, lose the spark, and justify the dream; but also worthy of remark will be the color scheme.
Complementing Kaufmann and Trues work, the Norwegian-born, naturalized American sculptor Oskar J.W. Hansen designed many of the sculptures on and around the dam. His works include the monument of dedication plaza, a plaque to memorialize the workers killed and the bas-reliefs on the elevator towers. In his words, Hansen wanted his work to express the immutable calm of intellectual resolution, and the enormous power of trained physical strength, equally enthroned in placid triumph of scientific accomplishment. because The building of Hoover Dam belongs to the sagas of the daring. Hansens dedication plaza, on the Nevada abutment, contains a sculpture of two winged-figures flanking a flagpole. Surrounding the base of the monument is a terrazzo floor embedded with a star map. The map depicts the Northern Hemisphere sky at the moment of President Roosevelts dedication of the dam. This is intended to help future astronomers, if necessary, calculate the exact date of dedication. The 30 feet high bronze figures, dubbed Winged Figures of the Republic, were each formed in a continuous pour. To put such large bronzes into position without marring the highlypolished bronze surface, they were placed on ice and guided into position as the ice melted. Hansens bas-relief on the Nevada elevator tower depicts the benefits of the dam: flood control, navigation, irrigation, water storage, and power. The bas-relief on the Arizona elevator depicts, in his words: the visages of those Indian tribes who have inhabited mountains and plains from ages distant.
河北省保定市高阳中学2015届高三上学期第十六次周练英语试卷
安徽省示范高中2015届高三第三次联考英语试卷(扫描版)
北京市房山区周口店中学2015届高三上学期期中考试英语试卷 Word版含答案
辽宁省朝阳市重点高中协作校2015届高三上学期期中考试试卷 英语 Word版含答案
山东省潍坊市2015届高三上学期期中考试英语试卷 Word版含答案
四川省某重点中学2015届高三上学期第四次月考试卷 英语 Word版含答案
河北省保定市重点高中2015届高三12月联考英语试卷
湖北省部分高中(大冶一中等校)2015届高三12月调考英语试卷(扫描版)
江苏省宿迁市沭阳银河学校2015届高三上学期12月月考试卷 英语 Word版含答案
江苏省东台市三仓中学2015届高三12月月考英语试卷
豫晋冀2015届高三上学期第二次调研考试试卷 英语 Word版含答案
河北省保定市高阳中学2015届高三上学期第十五次周练英语试卷
河北省唐山一中2015届高三上学期12月调研考试英语试卷word版含答案
江苏省南京市金陵中学河西分校2015届高三上学期期中考试英语试卷(无答案)
四川省新津中学2015届高三一诊模拟英语试卷
A mother
江苏省连云港市赣榆县海头高级中学2015届高三上学期期中考试英语试卷 Word版含答案
山东临沂市卧龙中学2015届高三上学期第三次月考英语试卷 Word版含答案
安徽省蚌埠市五中十二中2015届高三上学期期中考试英语试卷 Word版含答案
四川省成都外国语学校2015届高三12月月考试卷 英语 Word版含答案
河北省隆化县存瑞中学2015届高三上学期第二次质检英语试卷(无答案)
辽宁省大连市第二十高级中学2015届高三12月月考英语试卷
上海市宝山区2015届高三上学期期末质量监测英语试卷(文档版,含答案)
河南省洛阳市2015届高三上学期期中考试英语试卷
江西省崇义中学2015届高三上学期第四次(12月)月考英语试卷
安徽省宣城市八校2015届高三上学期联考英语试卷(扫描版)
黑龙江省大庆市铁人中学2015届高三12月月考英语试卷
安徽省蚌埠一中2015届高三上学期期中考试英语试卷 Word版无答案
上海市十三校2015届高三第一次联考英语试卷
江西省上高县第二中学2015届高三上学期第四次月考英语试卷
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |