standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
上一篇: 阅读(58)
下一篇: 六级冲刺练习:阅读(67)
2017届高考英语一轮复习考点规范练:1 必修1 Unit 1(北师大版含解析)
(通用版)2017届高考英语一轮阅读理解专题复习课件:第2讲 推理判断题
2017届高考英语一轮复习考点规范练:12 必修4 Unit 12(北师大版含解析)
2017届高考英语一轮复习考点规范练:6 必修2 Unit 6(北师大版含解析)
2017届高考英语一轮复习考点规范练:7 必修3 Unit 7(北师大版含解析)
I was in the fifth grade when I first dipped my fingers into the endless完形填空答案
如何毫不费力的拥有健康饮食?
2017届高考英语一轮复习单元检测练:必修4 Unit1《Women of achievement》(原卷版)
最新研究表明 一夫一妻制未必最合理
去你的国家旅行时,哪些事绝对不能做?
2017届高考英语一轮复习考点规范练:4 必修2 Unit 4(北师大版含解析)
2017届高考英语一轮复习单元检测练:必修4 Unit5《Theme parks》(原卷版)
年轻人少熬夜 早睡的人更聪明!
2017届高考英语一轮复习考点规范练:11 必修4 Unit 11(北师大版含解析)
2017届高考英语一轮复习单元检测练:必修5 Unit4《Making the news》(原卷版)
2017届高考英语一轮复习单元检测练:必修5 Unit3《Life in the future》(解析版)
2017届高考英语一轮复习单元检测练:必修5 Unit5《First aid》(原卷版)
Grey clouds move as low as smoke over the treetops at Lolo Pass.阅读理解答案
2017届高考英语一轮复习单元检测练:必修5 Unit4《Making the news》(解析版)
(通用版)2017届高考英语一轮阅读理解专题复习课件:第4讲 主旨大意题
2017届高考英语一轮复习考点规范练:10 必修4 Unit 10(北师大版含解析)
(通用版)2017届高考英语一轮阅读理解专题复习课件:第3讲 词义猜测题
2017届高考英语一轮复习单元检测练:必修1 Unit1《Friendship》(解析版)
研究已表明:写下自己的情绪有利于减少压力和焦虑
2017届高考英语一轮复习考点规范练:5 必修2 Unit 5(北师大版含解析)
2017届高考英语一轮复习单元检测练:必修4 Unit3《A taste of English humour》(解析版)
当穷人和富豪对换了彼此的生活 会发生什么呢
2017届高考英语一轮复习单元检测练:必修5 Unit5《First aid》(解析版)
2017届高考英语一轮复习单元检测练:必修4 Unit1《Women of achievement》(解析版)
梅兰妮·特朗普白宫肖像照惹争议 谁是最美美国第一夫人?