The process by which bricks are manufactured for the building industry can be outlined in seven consecutive steps. First the raw material, clay, which was just below the surface of soil in certain clay-rich areas has to be dug up by a digger.
Then the lumps of clay are placed on a metal grid in order to break up the big chunks of clay into much smaller areas, which fall through the metal grid onto a roller, whose motion further segregates the bits of clay. Sand and water are added to make a homogenous mixture, which is then either formed in moulds or cut into brick-shaped pieces by means of a wire cutter.
Those fresh bricks are then kept in a drying oven for at least 24 and a maximum of 48 hours, several dozens if not hundreds of bricks at a time. The dried bricks are then transferred to a so-called kiln, another type of high temperature oven. First they are kept at a moderate temperature of 200℃-1300℃. This process is followed by cooling down the finished bricks for 48 to 72 hours in a cooling chamber.
Once the bricks have cooled down and have become hard, they get packaged and delivered to their final destination, be it a building site or storage.
2016-2017学年高一英语下册课时课堂检测题23
2016-2017学年高二英语下册课时同步调研检测6
2016-2017学年高一英语下册课时课堂检测题2
2016-2017学年高一英语下册课时课堂检测题6
2016-2017学年高二英语下册课时同步调研检测8
九年级英语夯实基础总复习课件6
2017届高三英语阅读理解复习检测30
2016-2017学年高一英语下册课时课堂检测题19
2016-2017学年高一英语下册课时课堂检测题25
2016-2017学年高二英语下册课时同步调研检测22
九年级英语夯实基础总复习课件8
2016-2017学年高二英语下册课时同步调研检测3
2016-2017学年高一英语下册课时课堂检测题30
九年级英语夯实基础总复习课件7
2016-2017学年高一英语下册课时课堂检测题8
2016-2017学年高二英语下册课时同步调研检测24
2016-2017学年高一英语下册课时课堂检测题3
2016-2017学年高二英语下册课时同步调研检测17
2016-2017学年高二英语下册课时同步调研检测25
2016-2017学年高二英语下册课时同步调研检测16
2017届高三英语阅读理解复习检测29
2016-2017学年高二英语下册课时同步调研检测4
2016-2017学年高一英语下册课时课堂检测题28
2016-2017学年高一英语下册课时课堂检测题24
2016-2017学年高一英语下册课时课堂检测题5
2016-2017学年高二英语下册课时同步调研检测5
2016-2017学年高二英语下册课时同步调研检测7
2016-2017学年高一英语下册课时课堂检测题29
2016-2017学年高二英语下册课时同步调研检测21
2016-2017学年高二英语下册课时同步调研检测23
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |