The process by which bricks are manufactured for the building industry can be outlined in seven consecutive steps. First the raw material, clay, which was just below the surface of soil in certain clay-rich areas has to be dug up by a digger.
Then the lumps of clay are placed on a metal grid in order to break up the big chunks of clay into much smaller areas, which fall through the metal grid onto a roller, whose motion further segregates the bits of clay. Sand and water are added to make a homogenous mixture, which is then either formed in moulds or cut into brick-shaped pieces by means of a wire cutter.
Those fresh bricks are then kept in a drying oven for at least 24 and a maximum of 48 hours, several dozens if not hundreds of bricks at a time. The dried bricks are then transferred to a so-called kiln, another type of high temperature oven. First they are kept at a moderate temperature of 200℃-1300℃. This process is followed by cooling down the finished bricks for 48 to 72 hours in a cooling chamber.
Once the bricks have cooled down and have become hard, they get packaged and delivered to their final destination, be it a building site or storage.
2014年职称英语综合类完型填空练习(13)
2015年职称英语考试综合类C级完形填空练习(3)
2014年职称英语考试综合类完形填空课后习题(1)
2014职称英语综合B级练习:完形填空
2014年职称英语考试综合类完形填空典型练习题(3)
2014年职称英语考试综合类完形填空练习题(16)
2014年职称英语综合类完型填空练习(4)
2014年职称英语考试综合类完形填空精编练习题及答案(3)
综合类B级完型填空
2014年职称英语考试综合类完形填空精编练习题及答案(2)
职称英语考试课堂笔记综合类C级完型填空第3讲
2014年职称英语考试综合类完形填空课后习题(5)
2014年职称英语考试综合类完形填空精编练习题及答案(5)
2014年职称英语考试综合类完型填空新增文章(1)
2014年职称英语教材完型填空新增部分(综合类)
2014年职称英语综合类完型填空练习(7)
2014年职称英语考试综合类完形填空典型练习题(1)
2014年职称英语综合类完型填空练习(8)
2015年职称英语考试综合类C级完形填空练习(5)
2014年职称英语考试综合类完型填空新增文章(2)
综合类A级完型填空
2014年职称英语考试综合类C级完形填空专项训练一
2015年职称英语考试综合类C级完形填空练习(4)
2014年职称英语理工类阅读理解新增文章参考译文
2014年职称英语考试综合类完形填空练习题(17)
2014年职称英语考试综合类完形填空典型练习题(4)
2014年职称英语综合类完型填空练习(1)
2014年职称英语综合类完型填空练习(14)
职称英语考试课堂笔记综合类C级完型填空第5讲
2015年职称英语考试综合类C级完形填空练习(1)
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |