The process by which bricks are manufactured for the building industry can be outlined in seven consecutive steps. First the raw material, clay, which was just below the surface of soil in certain clay-rich areas has to be dug up by a digger.
Then the lumps of clay are placed on a metal grid in order to break up the big chunks of clay into much smaller areas, which fall through the metal grid onto a roller, whose motion further segregates the bits of clay. Sand and water are added to make a homogenous mixture, which is then either formed in moulds or cut into brick-shaped pieces by means of a wire cutter.
Those fresh bricks are then kept in a drying oven for at least 24 and a maximum of 48 hours, several dozens if not hundreds of bricks at a time. The dried bricks are then transferred to a so-called kiln, another type of high temperature oven. First they are kept at a moderate temperature of 200℃-1300℃. This process is followed by cooling down the finished bricks for 48 to 72 hours in a cooling chamber.
Once the bricks have cooled down and have become hard, they get packaged and delivered to their final destination, be it a building site or storage.
日常口语精华集2
2011年实用口语练习:有钱人 称心如意
对学英语最有帮助的英文绕口令
2011年实用口语练习:生活奢华的猪
2011年实用口语练习:各种哭的说法(二)
如何用英文表达“我不太想做某事”
2011年实用口语练习:我是无辜的
2011年实用口语练习:英语客套话
2011年实用口语练习:你还在犹豫吗?
如何用英文回复“邀请”
2011年实用口语练习:Select courses 选课
2011年实用口语练习:你担心什么呢?
2011年实用口语练习:Assignment 家庭作业
如何用英文提出“邀请”
2011年实用口语练习:我办事你放心
英文结婚短信祝福语
2011年实用口语练习:各种睡不着
如何提高英语口语
英文单词 “Do”的活用
2011年实用口语练习:高考作弊
2011年实用口语练习:睡或不睡
2011年实用口语练习:课堂讲座
流行口语:跟美国人打招呼的地道说法
2011年实用口语练习:课余阅读
2011年实用口语练习:“挑刺儿”
2011年实用口语练习:是鲁莽还是勇气可嘉
2011年实用口语练习:不得不分
2011年实用口语练习:劝君“上当”一回
2011年实用口语练习:接待用语
2011年实用口语练习:各种“乱七八糟”的表达
不限 |
英语教案 |
英语课件 |
英语试题 |
不限 |
不限 |
上册 |
下册 |
不限 |