CAIRO, Aug. 15 -- The Egyptian Ministry of Transport and a coalition of Chinese firms signed on Tuesday an agreement worth 1.24 billion U.S. dollars to build a light rail transit in new districts around Cairo.
The aspired light rail is a fast tram expected to cover a distance of 66 km with 11 stops, connecting the under-construction new administrative capital city with distant districts of Greater Cairo including Al-Salam City, Ramadan 10 City, Obour City, Badr City and Shorouk City.
The signing ceremony between Egypt's National Authority for Tunnels (NAT) and the joint coalition of China's AVIC International and China Railway Group Limited was attended by Egyptian Prime Minister Sherif Ismail, Transport Minister Hesham Arafat and Chinese Ambassador to Cairo Song Aiguo.
NAT chief Tarek Gamal El-Din said the project will start within two or three months, expecting it to accommodate 340,000 passengers daily, reduce traffic on the Cairo-Ismailia highway by about 30 percent and save Egypt some 2.3 billion Egyptian pounds (about 129.5 million dollars) annually.
Egyptian President Abdel-Fattah al-Sisi met earlier in mid-July with the Chinese coalition for negotiations over the key project.
The Chinese group said it would assign Egyptian contractors with some civil and railway construction works that will provide thousands of job opportunities in the country.
Egypt and China enjoy strong bilateral relations that have been elevated to the level of comprehensive strategic partnership. The two countries marked in 2016 the 60th anniversary of the establishment of their diplomatic relations.
The volume of trade between Egypt and China has mounted to 11.3 billion U.S. dollars in 2016, ranking Egypt as the third African trade partner with China.
新疆新源县第八中学2016届高三英语专题复习:特殊句式1
国际英语资讯:Sporadic battles erupt in water-rich valley near Damascus
新疆新源县第八中学2016高考英语备考复习课件:非谓语动词5
湖北省监利一中2016届高三英语单词竞赛试题(十一)
2016高考英语外研版必修4《Module 3 Body Language and Non-verbal Communication》SectionⅡ速效提能演练
新疆新源县第八中学2016届高三英语专题复习:定语从句
2016高考英语外研版必修3《Module 6 Old and New》SectionⅡ速效提能演练
国内英语资讯: China to quadruple new energy vehicle production by 2020: minister
新疆新源县第八中学2016届高三英语专题复习:倒装、强调句题组
新疆新源县第八中学2016届高三英语专题复习:名词性从句
2016高考英语外研版必修4《Module 3 Body Language and Non-verbal Communication》SectionⅢ速效提能演练
新疆新源县第八中学2016届高三英语专题复习:特殊句式
新疆新源县第八中学2016届高三英语专题复习:语法系列训练情态动词
国内英语资讯:China to promote PPP model in Belt and Road Initiative
国际英语资讯:U.S. stocks mixed amid economic data, Trump press conference
新疆新源县第八中学2016届高三英语专题复习:语法系列训练情态动词和虚拟语气
新疆新源县第八中学2016高考英语备考复习课件:英语作文
2016高考英语必备得分精练题:第5周(课件)19
国际英语资讯:Trumps team raises record 90 million U.S. dollars for inauguration day events
2016高考英语必备得分精练题:第3周(课件)11
第47届达沃斯论坛主题前瞻
2016高考英语外研版必修4《Module 4 Great Scientists》SectionⅢ速效提能演练
新疆新源县第八中学2016届高三英语专题复习:书面表达常用连接词及句型
2016高考英语外研版必修4《Module 1 Life in the Future》SectionⅡ速效提能演练
新疆新源县第八中学2016届高三英语专题复习:特殊句式 课件
2016高考英语外研版必修3《Module 6 Old and New》SectionⅢ速效提能演练
2016高考英语外研版必修4《Module 1 Life in the Future》SectionⅢ速效提能演练
新疆新源县第八中学高二英语人教版《倒装句》课件
新疆新源县第八中学2016届高三英语专题复习:数词专项
新疆新源县第八中学2016届高三英语专题复习:非谓语动词
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |