XI'AN, Jan. 26 -- A large U-shaped tunneling shield completed excavation of a railway tunnel in northwest China's Shaanxi Province Friday.
The U-shaped machine, 10.95 meters high, 11.9 meters wide and 110 meters in length, is an improvement on the traditional round tunnel boring machine. Its shape and design were customized for the construction of Baicheng Tunnel on the Loess Plateau, where the soil is powdery and dry.
It is the first U-shaped tunneling shield of such big size in the world, according to China Tiesiju Civil Engineering Group, the contractor.
The machine began work on the 3.3-kilometer Baicheng Tunnel in November 2016.
The machine significantly reduced the excavation time and engineering costs compared with round tunnel boring machine.
Baicheng Tunnel is part of the Menghua Railway, a coal transport route linking Inner Mongolia with Jiangxi Province.
小升初大转变如何巧妙衔接
备战2012小升初六大基本攻略
“六升七” 小升初准备要趁早
小升初招生开始 专家建议家长调整好心态
从七个方面考察小升初目标学校
小升初阶段孩子叛逆该如何有效的沟通
备战小升初:五年级学生如何学奥数
家教指导:小升初家长对待孩子的三个误区
2012小升初择校 家长一定要考虑的五个方面
专家:小升初家长孩子都需越道心理“坎儿”
北京上地实验学校小升初综合素质面试题
给小升初特长生备考的4点建议
郑州小升初衔接学习方法指导
升学攻略:“小升初”升学的七大途径
北京四中小升初综合素质面试题及解析
宁波小升初如何帮助孩子挑选适合的学校
小升初学生如何合理安排学习
小升初择校热 公办校学区房受冷 民办初中吃香
2012小升初政策5月公布 双管齐下治理择校费
北京八一中学小升初面试题精选
人大附中小升初面试题精选
小升初学生进入自主阶段 家长不要当"保姆"
小升初阶段家长注意和孩子沟通
新学期攻略:小升初寄宿生需做哪些开学准备
专家提醒:五大渠道了解小升初信息
小升初特长生培养要精 不宜战线太长
小升初疯狂择校:谁之责
掌握3招考试技巧小升初胜券在握
一份优秀的小升初简历应具备的四要素
小升初数学必备知识体系
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |