WINDHOEK, Feb. 9 -- Namibia's port in the coastal town of Walvis Bay will become the "most brilliant pearl on the Atlantic Coast of southwest Africa" with the delivery of four ship-to-shore (STS) cranes manufactured by China, the Chinese ambassador to the country said Friday.
Chinese Ambassador to Namibia Zhang Yiming made this remark at a ceremony held at the harbor town, about 400 km from the capital Windhoek.
The cranes, manufactured by China's Zhenhua Port Machinery Company, will be deployed at the new container terminal that is expected to be completed by mid-2019.
The project, developed by the state-run China Harbor Engineering Company (CHEC) since 2017, will have a throughput capacity of 750,000twenty-foot equivalent units (TEUs) per year.
Expected to be completed by mid-2019, the terminal will have two 600-meter-long berths and accommodate container vessels of 8,000 TEUs.
Zhang said the arrival of the cranes is not only key to the port's construction, but also indicates that the project is about to be completed soon, making Walvis Bay the most splendid city on the Atlantic Coast of southwest Africa.
"It can be said that this is the benchmark project for China-Namibia friendly and pragmatic cooperation, which symbolizes the great attention of our leaders to our relations and the brotherhood between our people," Zhang said.
Chief Executive Officer of Namibia Ports Company (Namport) Bisey Uirab said the ship-to-shore cranes are major components of the new container terminal project and their application is regarded as a milestone in the life cycle of the port as it is the very first time that this type of cranes is being deployed.
"The ship-to-shore crane is the largest container-handling equipment and will improve efficiencies and enable faster ship turnaround time, which will make our terminal attractive for shipping lines," Uirab said.
He also said the STS cranes can load or offload up to 40 containers per hour while a mobile harbor crane can only deal with 15 containers per hour on average.
Uirab said the cranes, each of which cost 110 million Namibian dollars (about 9 million U.S. dollars), can attain a height of up to 70 meters during operation.
If the booms are raised, Uirab added, the crane's height can reach 122meters, while the boom reaching from the seaside leg will be 69 meters long.
"The cranes run on two crane rails which are 100 feet (about 30.5 meters) apart, and they run for the full 600-meter length of the quay wall," he said.
Earlier this month, Namport said the Namibian 344 million-U.S.-dollar container terminal currently under construction in Walvis Bay is 76 percent completed.
The new port will also be connected to the existing port's road and rail networks as well as communication systems.
国外流行的“中餐”,很多中国人根本不认识
外媒看中国:面对支付宝和微信,Apple心累
2016届广东省天河区高考英语二轮语法复习精讲精练:状语从句04
2017届高考英语一轮复习考点规范练:必修2 5 Theme B(重庆大学版)
2017届高考英语一轮复习考点规范练:必修4 12 Theme C(重庆大学版)
2016届高考英语二轮复习精练:完形填空(2)
2017届高考英语一轮复习考点规范练:必修1 3 Theme C(重庆大学版)
2016届高考英语二轮复习精练:完形填空(4)
2016届高考英语二轮复习精练:完形填空(6)
伦敦桥行动:英国女王葬礼流程公布
2016届高考英语二轮复习精练:完形填空(8)
2016届广东省天河区高考英语二轮语法复习精讲精练:状语从句08
2017届高考英语一轮复习考点规范练:必修2 6 Theme C(重庆大学版)
2017届高考英语一轮复习考点规范练:3 滚动测试(重庆大学版)
2016届高考英语二轮复习精练:完形填空(7)
2016届广东省天河区高考英语二轮语法复习精讲精练:状语从句09
2016届高考英语二轮复习精练:完形填空(23)
2017届高考英语一轮复习考点规范练:2 滚动测试(重庆大学版)
2017届高考英语一轮复习考点规范练:必修5 14 Theme B(重庆大学版)
2016届高考英语二轮复习精练:完形填空(25)
2016届广东省天河区高考英语二轮语法复习精讲精练:定语从句07
2017届高考英语一轮复习考点规范练:必修3 9 Theme C(重庆大学版)
2016届广东省天河区高考英语二轮语法复习精讲精练:状语从句06
2017届高考英语一轮复习考点规范练:必修1 2 Theme B(重庆大学版)
2016届广东省天河区高考英语二轮语法复习精讲精练:定语从句08
2016届高考英语二轮复习精练:完形填空(20)
2017届高考英语一轮复习考点规范练:必修1 1 Theme A(重庆大学版)
2016届广东省天河区高考英语二轮语法复习精讲精练:定语从句06
2016届广东省天河区高考英语二轮语法复习精讲精练:定语从句03
2017届高考英语一轮复习考点规范练:必修4 11 Theme B(重庆大学版)
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |