TAIYUAN, June 1 -- Workers Friday started to lay the tracks for the Datong-Zhangjiakou high-speed railway line.
The railway line starts from the city of Datong in Shanxi Province and ends in Hebei Province's Zhangjiakou city, co-host of the 2022 Winter Olympics.
The new railway line is an important part of the high-speed railway network to be built during the 13th Five-Year Plan period (2016-2020).
Construction of the 140-km line was launched in November 2017.
With trains running at 250 kph, travel time between Datong and Zhangjiakou will be 40 minutes, while that between Datong and Beijing will be cut from six hours to just 100 minutes.
The railway is scheduled to begin operation by the end of 2019.
雅思分类词汇整理:世贸 4
雅思分类词汇整理:银行交易
雅思常考的十一类关联词
备考资料:雅思高频词汇汇总6
雅思分类词汇整理:机场
备考资料:雅思高频词汇汇总7
雅思分类词汇整理:火山爆发-5
雅思分类词汇整理:外贸 2
备考资料:雅思高频词汇整理(2)
雅思分类词汇整理:热带雨林-2
雅思口语常用名词整理(4)
雅思分类词汇整理:度量衡
雅思分类词汇整理:热带雨林-5
两个方面着手轻松掌握雅思词汇
名师指导:教你背诵雅思词汇的方法
雅思分类词汇整理:动物 1
雅思分类词汇整理:职务 2
备考资料:雅思高频词汇整理(4)
雅思口语掌握一定词汇量有益处
雅思备考分类词汇:公共标志(2)
雅思分类词汇整理:纸媒 2
雅思备考:词汇是基础
雅思备考分类词汇:银行交易
雅思分类词汇整理:教育 3
雅思分类词汇整理:味道
备考资料:雅思高频词汇汇总2
利用日常生活记忆雅思口语词汇
备考资料:雅思高频词汇汇总1
备考资料:雅思高频词汇汇总4
雅思备考分类词汇:公共标志(6)
| 不限 |
| 英语教案 |
| 英语课件 |
| 英语试题 |
| 不限 |
| 不限 |
| 上册 |
| 下册 |
| 不限 |