These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
上一篇: 四级冲刺练习阅读92
下一篇: 四级冲刺练习阅读66
近三年高考(2017-2016)英语试题分项版解析:专题12 交际用语(解析版)
青春
三年高考(2017-2015)英语试题分项精析版:专题05 动词的时态和语态(原卷版)
追求性别平等 澳大利亚引入女版红绿灯
对鼻子形状不满意?这要怪气候咯
BBC:非英语公司规定说英语,越来越普遍
近三年高考(2017-2016)英语试题分项版解析:专题15 社会生活、说理议论类(原卷版)
近三年高考(2017-2016)英语试题分项版解析:专题19 完形填空之夹叙夹议(解析版)
三年高考(2017-2015)英语试题分项精析版:专题07 非谓语动词(原卷版)
三年高考(2017-2015)英语试题分项精析版:专题10 名词性从句(原卷版)
近三年高考(2017-2016)英语试题分项版解析:专题17 阅读新题型(原卷版)
如何为求职面试做准备?
福建省厦门市2017届高三3月质量检测英语试卷
英语新词:旧词新义
近三年高考(2017-2016)英语试题分项版解析:专题12 交际用语(原卷版)
近三年高考(2017-2016)英语试题分项版解析:专题18 完形填空之记叙文(原卷版)
近三年高考(2017-2016)英语试题分项版解析:专题20 完形填空之议论文和说明文类(原卷版)
近三年高考(2017-2016)英语试题分项版解析:专题21 语法填空(原卷版)
可爱的机械猫耳,督促你纠正不当姿势
Making money from your spare room 空房间变生财之道
甘肃省天水市、兰州市2017届高三下学期一模考试英语试卷
中国一小学组织活动抗议韩国部署萨德
妈妈的双手 My Mother’s Hands
三年高考(2017-2015)英语试题分项精析版:专题06 情态动词和虚拟语气(原卷版)
Rescued chimp, Professor's viral fame 黑猩猩幼崽重获新生、意外成名的教授家庭
英语新词:专业术语
三年高考(2017-2015)英语试题分项精析版:专题04 动词和动词短语 (原卷版)
近三年高考(2017-2016)英语试题分项版解析:专题16 科普类说明文(原卷版)
体坛英语资讯:Warriors, Timberwolves to play two preseason games in China
三年高考(2017-2015)英语试题分项精析版:专题08 定语从句(原卷版)