standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
上一篇: 阅读(58)
下一篇: 六级冲刺练习:阅读(67)
2017届高考英语一轮复习课件:必修2 Unit3《Computers》(新人教版福建专用)
黑龙江省名校高三英语语法专题训练:第9讲非谓语动词
2017届高考英语一轮复习课件:必修1 Unit 4《Earthquakes》(新人教版福建专用)
陕西省汉中市陕飞二中高三英语《阅读理解》课件(2)
黑龙江省名校高三英语语法专题训练:第14讲情景交际
黑龙江省名校高三英语语法专题第8讲情态动词和虚拟语气
2017届高考英语一轮复习课件:必修2 Unit1《Cultural relics》(新人教版福建专用)
陕西省汉中市陕飞二中高三英语《阅读理解》课件(3)
2017届高三高考英语最后六月冲刺(2)阅读表达题(有详解)
2017届高考英语一轮复习课件:必修1 Unit 1《Friendship》(新人教版福建专用)
2017届高考英语一轮复习课件:必修1 Unit 2《English around the world》(新人教版福建专用)
黑龙江省名校高三英语语法专题训练:第13讲特殊句式
黑龙江省名校高三英语语法专题训练:第10讲定语从句
2017届高考英语一轮复习课件:必修2 Unit 4《Wildlife protection》(新人教版福建专用)
黑龙江省名校高三英语语法专题第1讲冠词
江苏省栟茶高级中学校本化资料 考前一周自主复习英语(7)
黑龙江省名校高三英语语法专题第7讲时态和语态
黑龙江省名校高三英语语法专题第5讲介词
黑龙江省名校高三英语语法专题第12讲连词和状语从句
陕西省汉中市陕飞二中高三英语二轮复习《状语从句》课件(2)