In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of
standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
1. The main difference between panel method and the method discussed in the last paragraph is_______.
A. the latter uses ready-made internal features
B. panels are cast in a level position
C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D. the former is more expensive than the latter
22. Which of these statements is TRUE of system building?
A. It employs more men. B. It is difficult and dangerous.
C. It can save both time and money. D. It means less mechanization.
23. According to the passage, the principle of system building is that_______.
A. construction methods are safer
B. buildings are made from a set of standardized units
C. similar buildings can be produced
D. all units are produced on the site
24. The usual fixed length in the modular system is_______.
A. twenty centimeters B. ten millimeters
C. fifty centimeters D. ten centimeters
25. What lifts the concrete panels onto the building?
A. Cranes. B. Man-power.
C. Pulleys. D. Hydraulic jacks.
21. A 22. C 23. B 24. D 25. A
上一篇: “查缺补漏”巧解四六级的完成句子题
下一篇: 四六级备考:阅读真题常见的短语(13)
双语小说阅读:《谁动了我的奶酪》(8)
英国8岁富翁:网上卖弹球身价愈百万
浪费生命、蹉跎人生的50件事III
双语小说阅读:《谁动了我的奶酪》(6)
国际英语资讯:Trump signs two-year budget deal to boost spending, lift debt ceiling
踏遍世界新七大奇迹
国内英语资讯:China attaches great importance to cooperation with UN: envoy
在你追逐梦想前会听到的十句谎言
国内英语资讯:Commentary: Blaming China for US fentanyl issue totally unacceptable
英众多父母为孩子储存脐带血
国内英语资讯:Internet economy, a key contributor to Chinas new economic driver
陌生人能认出“善良”基因
失眠困扰过半英国人 或导致恋情不顺
国内英语资讯:Hong Kong society strongly condemns act of flinging Chinese national flag into sea
On Go to Study Abroad at Young Age 论年幼留学
国际英语资讯:News Analysis: U.S. Mideast peace plan doomed to failure without Palestinians consent: exp
国内英语资讯:RCEP negotiations make significant headway in Beijing
体坛英语资讯:Mahrez leads Algeria to AFCON final by late winner against Nigeria
青少年游戏爱好者大脑结构和赌徒类似
LV老板超越盖茨成为世界第二富